Skip to main content

New flyover construction programme planned for Hyderabad

A new transport pan for the Indian city of Hyderabad will see a series of flyovers being built. In all 20 new multi-level flyovers are planned for Hyderabad, capital of India’s Telengana State. The work will form part of the US$635.5 million Strategic Road Development Plan (SRDP) for Hyderabad. The work will be carried out under a design, build, maintain and transfer model and the cost includes carrying out the civils works as well as land acquisition. Greater Hyderabad Municipal Corporation (GHMC) has prop
June 4, 2015 Read time: 1 min
A new transport pan for the Indian city of Hyderabad will see a series of flyovers being built. In all 20 new multi-level flyovers are planned for Hyderabad, capital of India’s Telengana State. The work will form part of the US$635.5 million Strategic Road Development Plan (SRDP) for Hyderabad. The work will be carried out under a design, build, maintain and transfer model and the cost includes carrying out the civils works as well as land acquisition. Greater Hyderabad Municipal Corporation (GHMC) has proposed constructing a series of skyways, major corridors, flyovers and grade separators for the project. The work will be carried out several key locations around the city including the KBR Park entrance junction, the Maharaja Agrasen junction and the Cancer Hospital junction.

Related Content

  • India’s US$20.5 billion road building plans
    August 22, 2024
    India has plans for US$20.5 billion of road building works.
  • New India coastal highway planned
    February 3, 2015
    A new coastal highway is being planned in India that will connect the north and south of Mumbai. The project is being planned jointly by the Maharashtra State Government and the Brihanmumbai Municipal Corporation (BMC). The US$1.38 billion Nariman Point-Kandivli road project will stretch some 36.5km. The work includes the need to reclaim some 110ha of land, for which a proposal by BMC has been approved by the Maharashtra Coastal Zone Management Authority. The agreement requires that this area of land can on
  • Major project to construct landmark Bay Bridge in California
    October 31, 2012
    Iconic California crossing will offer seismic safety – Adrian Greeman reports A unique single-span single-tower suspension bridge is the iconic centrepiece of a dramatic renewal of the eastern Bay Bridge in California, crossing from San Francisco to Oakland. Tourists in San Francisco sometimes mix up their bridges, identifying as the famous Golden Gate, the double suspension bridge which runs across the wide San Francisco Bay. These serially linked bridges in fact form the Bay Bridge east to Oakland whereas
  • Pre-stressed bridge decks use modular formwork system
    July 9, 2012
    Imaginative formwork, often using modular components, is helping to shape some challenging bridges worldwide. Patrick Smith reports Traffic volumes in and around Prague have swollen massively in recent years, pushing the existing road network to the limits of its capacity. To permanently ease congestion in the Czech capital's centre, a multi-lane orbital motorway is under construction as a high capacity bypass for central Prague and to link up all the motorways and other major highways radiating from the ci