Skip to main content

New flyover construction programme planned for Hyderabad

A new transport pan for the Indian city of Hyderabad will see a series of flyovers being built. In all 20 new multi-level flyovers are planned for Hyderabad, capital of India’s Telengana State. The work will form part of the US$635.5 million Strategic Road Development Plan (SRDP) for Hyderabad. The work will be carried out under a design, build, maintain and transfer model and the cost includes carrying out the civils works as well as land acquisition. Greater Hyderabad Municipal Corporation (GHMC) has prop
June 4, 2015 Read time: 1 min
A new transport pan for the Indian city of Hyderabad will see a series of flyovers being built. In all 20 new multi-level flyovers are planned for Hyderabad, capital of India’s Telengana State. The work will form part of the US$635.5 million Strategic Road Development Plan (SRDP) for Hyderabad. The work will be carried out under a design, build, maintain and transfer model and the cost includes carrying out the civils works as well as land acquisition. Greater Hyderabad Municipal Corporation (GHMC) has proposed constructing a series of skyways, major corridors, flyovers and grade separators for the project. The work will be carried out several key locations around the city including the KBR Park entrance junction, the Maharaja Agrasen junction and the Cancer Hospital junction.

Related Content

  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • US$613 million new New Zealand road funding budget
    June 12, 2024
    New Zealand is setting a new road funding budget worth US$613 million.
  • Flyover collapses in Indian city Kolkata
    March 31, 2016
    A flyover has collapsed in the Indian city of Kolkata. Reports from the local press suggest 14 fatalities and upwards of 150 people being trapped in the wreckage. The Times of India reports that the flyover was under construction at the time of its collapse and the reason for the structural failure has yet to be determined. The flyover is located in a densely populated area in the north of the city and the death toll looks likely to climb.