Skip to main content

New Florida toll road under construction

Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018. The Wekiva Parkway is being planned jointly between CFX, the Florida Department of Transportation and Florida’s Turn
June 27, 2016 Read time: 2 mins
Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018.

The Wekiva Parkway is being planned jointly between CFX, the 2697 Florida Department of Transportation and Florida’s Turnpike Enterprise. The five CFX Wekiva Parkway sections, located in Orange County and a small portion in Lake County, total 16km and more than $270 million in construction costs.

CFX plans to open its first Wekiva Parkway section, from SR 429 at US 441 to the Kelly Park Road interchange, in spring 2017. All of CFX’s Wekiva Parkway sections are scheduled to be open to traffic in January 2018.

The Wekiva Parkway will complete the beltway around northwest Central Florida and reduce traffic congestion on US 441, SR 46 and other area roads. The 40km parkway will feature all electronic tolling, allowing motorists to pay their tolls at highway speeds, without having to slow down or stop. Drivers will be able to pay their tolls using E-PASS or via the CFX Pay by Plate programme.

For more information on companies in this article

Related Content

  • Korean bridge construction poses challenges
    April 5, 2012
    On South Korea's southern coast, an innovative highway sea crossing is providing many engineering challenges The new Busan-Geoje crosses from South Korea's second city to its biggest island and is slightly shorter than the 12km of the country's famous Incheon project. In addition the main cable stay bridge for the Busan-Geoje project has a 475m span rather than the 800m of the Incheon central span. However the 8.2km Busan-Geoje project faces perhaps greater technical challenges and also includes a second b
  • Key project for US commences
    February 14, 2012
    In the US work is now commencing on the key I-269 highway upgrade at Byhalia in the state of Mississippi. The new US$19.5 million section now under construction will complete the beltway around nearby Memphis, Tennessee.
  • New bypass for Meghalaya, India
    November 21, 2014
    A new two-lane road has been built in Meghalaya, India, providing a challenging project for the construction team The new road lies at a comparatively high altitude and provides a bypass around Shillong, the capital of Meghalaya and which is one of the smallest states in India. Shillong is located 1,496m above sea level, with the highest point being Shillong Peak at almost 2,000m, and the area has a much cooler climate than the rest of tropical India. Shillong is also only 55km away from Mawsynram, which is
  • Russia's massive transport programme
    May 2, 2012
    Russia is rolling forward with a massive programme of road building and reconstruction. The plans call for some 5,700 km of federal highways to be repaired by 2017. At present, only 38% of Russia's roads are in good condition and this has been identified as a key priority for improvement by the country's Government.Meanwhile the authorities in the Russian city of St Petersburg have a target infrastructure investment programme for 2012 as well as plans for 2013 and 2014