Skip to main content

New Florida toll road under construction

Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018. The Wekiva Parkway is being planned jointly between CFX, the Florida Department of Transportation and Florida’s Turn
June 27, 2016 Read time: 2 mins
Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018.

The Wekiva Parkway is being planned jointly between CFX, the 2697 Florida Department of Transportation and Florida’s Turnpike Enterprise. The five CFX Wekiva Parkway sections, located in Orange County and a small portion in Lake County, total 16km and more than $270 million in construction costs.

CFX plans to open its first Wekiva Parkway section, from SR 429 at US 441 to the Kelly Park Road interchange, in spring 2017. All of CFX’s Wekiva Parkway sections are scheduled to be open to traffic in January 2018.

The Wekiva Parkway will complete the beltway around northwest Central Florida and reduce traffic congestion on US 441, SR 46 and other area roads. The 40km parkway will feature all electronic tolling, allowing motorists to pay their tolls at highway speeds, without having to slow down or stop. Drivers will be able to pay their tolls using E-PASS or via the CFX Pay by Plate programme.

For more information on companies in this article

Related Content

  • Acrow, hydraulically driven in NY
    August 18, 2020
    Detour bridges over Westchester Creek in the Bronx, part of greater New York city, are reportedly the first hydraulically-driven temporary lift bridges in the US
  • Repairing concrete roads using new technology
    July 28, 2015
    In the US state of Arkansas, a key stretch of concrete roads has been improved, allowing it to cope with current traffic volumes.
  • Costa Rica road projects moving forward - slowly
    July 18, 2017
    Costa Rica is moving ahead with a series of major road projects, but progress is proving slower than anticipated or desired. The Costa Rica Government is struggling to achieve satisfactory progress with its overall road improvement programme. So far the key focus has been on maintaining existing links rather than building and improving road connections. The country’s National Laboratory for Structural Material and Models (Lanamme) has produced a report revealing that 85% of the national roads are in accepta
  • Major US interchange project underway
    February 14, 2012
    Work is starting in the US on a US$356 million interchange project that will connect I-95, I-91 and Route 34 Interchange in New Haven.