Skip to main content

New Florida toll road under construction

Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018. The Wekiva Parkway is being planned jointly between CFX, the Florida Department of Transportation and Florida’s Turn
June 27, 2016 Read time: 2 mins
Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018.

The Wekiva Parkway is being planned jointly between CFX, the 2697 Florida Department of Transportation and Florida’s Turnpike Enterprise. The five CFX Wekiva Parkway sections, located in Orange County and a small portion in Lake County, total 16km and more than $270 million in construction costs.

CFX plans to open its first Wekiva Parkway section, from SR 429 at US 441 to the Kelly Park Road interchange, in spring 2017. All of CFX’s Wekiva Parkway sections are scheduled to be open to traffic in January 2018.

The Wekiva Parkway will complete the beltway around northwest Central Florida and reduce traffic congestion on US 441, SR 46 and other area roads. The 40km parkway will feature all electronic tolling, allowing motorists to pay their tolls at highway speeds, without having to slow down or stop. Drivers will be able to pay their tolls using E-PASS or via the CFX Pay by Plate programme.

For more information on companies in this article

Related Content

  • Make the case for electronic tolling, ASECAP conference delegates heard
    September 14, 2015
    Mobility pricing and electronic tolling is the future, delegates to a recent ASECAP Study Days conference, reports Geoff Hadwick at the Lisbon event. The international road tolling industry is failing to make its case and the sector is losing out to other social and political lobby groups. As a result, “tolling is still on the sidelines”, according to the head of the Washington-based International Bridge, Tunnel and Turnpike Association. IBTTA chief executive Pat Jones issued his stark warning at the
  • Virginia tunnel project seeing advance
    July 19, 2023
    Virginia’s massive tunnel project is seeing advance.
  • Photo tolling on the Tacoma Narrows Bridge
    April 25, 2012
    "We regularly hear from drivers, usually visitors from out of town, who unintentionally missed the toll booth and want to know what to do to pay the toll," said WSDoT Toll Division Director Craig Stone.
  • UK’s A14 upgraded route opening early
    October 14, 2019
    A key section of the UK’s important A14 upgrade project is opening to traffic ahead of schedule. Work to deliver the new stretch of dual carriageway for the A14 bypass is being completed a full 12 months early. The bypass section will open to drivers in December 2019, cutting congestion and journey times. Work on the 19km bypass section commenced in October 2016 and forms part of a programme of 33.6km of road works in Cambridgeshire, costing £1.5 billion. The road building project has been carried out by