Skip to main content

New Florida toll road under construction

Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018. The Wekiva Parkway is being planned jointly between CFX, the Florida Department of Transportation and Florida’s Turn
June 27, 2016 Read time: 2 mins
Superior Construction will build the fifth and final section of Florida’s Wekiva Parkway Project in the US. The US$38.65 million contract was awarded by the Central Florida Expressway Authority (CFX). Superior’s section of the project will be from Kelly Park Road and Country Road 436/Mount Plymouth Road. This work will commence in early August 2016 and should be completed by January 2018.

The Wekiva Parkway is being planned jointly between CFX, the 2697 Florida Department of Transportation and Florida’s Turnpike Enterprise. The five CFX Wekiva Parkway sections, located in Orange County and a small portion in Lake County, total 16km and more than $270 million in construction costs.

CFX plans to open its first Wekiva Parkway section, from SR 429 at US 441 to the Kelly Park Road interchange, in spring 2017. All of CFX’s Wekiva Parkway sections are scheduled to be open to traffic in January 2018.

The Wekiva Parkway will complete the beltway around northwest Central Florida and reduce traffic congestion on US 441, SR 46 and other area roads. The 40km parkway will feature all electronic tolling, allowing motorists to pay their tolls at highway speeds, without having to slow down or stop. Drivers will be able to pay their tolls using E-PASS or via the CFX Pay by Plate programme.

For more information on companies in this article

Related Content

  • Parsons wins Florida interchange redesign contract
    February 23, 2017
    The Florida Department of Transportation has awarded Parsons a contract to carry out an analysis of the I-95 Interchange with LPGA Boulevard in Volusia County. The contract involves analysing the conceptual layout and ultimate reconfiguration of the interchange, followed by providing final design services once the best solution has been selected. The work is needed as traffic and congestion are expected to increase due to the rise in residential and commercial development in the Daytona Beach area. The I-9
  • Russia to commission new Moscow-St Petersburg highway by 2020
    June 20, 2017
    Final delivery of the final stretch for Russia’s key highway project looks set to be delayed – Eugene Gerden writes. I now looks as if Russia’s most ambitious project in the field of road building in recent years, the building of a new high-speed road link between Moscow and St Petersburg, the country’s largest cities, will not be complete in time. The project was set up by the Russian government and several private investors. According to initial state plans, building of the new road should have been compl
  • Colorado construction contract coming
    December 6, 2017
    Construction for a key congestion cutting contract in Colorado is coming shortly.
  • California connection construction contract
    March 23, 2017
    In California construction is commencing on a connection called Cow Camp Road. Engineering work is being carried out on the project by Michael Baker International. The firm is handling Phase 2 of a contract by Rancho Mission Viejo LLC (RMV). The road will be located in south Orange County, California. Cow Camp Road. This 6.4km stretch of highway will improve connections between Antonio Parkway and Ortega Highway (SR-74). The planned improvements will be carried out in Phases 2A, 2B, 2C and 2D. The work bein