Skip to main content

New firm to manage US$181.84mn New Zealand road project

In New Zealand, Westland District Council has established Westland Properties to manage a US$181.84 million (NZD 220 million) road project between Milford Sound and Haast. The new South Island road is expected to cover 110km-138km and close to 80km will be located in Southland district. Travelling time between Haast and Milford Sound will be reduced by four to five hours once the new road is completed.
November 8, 2013 Read time: 1 min
In New Zealand, Westland District Council has established Westland Properties to manage a US$181.84 million (NZD 220 million) road project between Milford Sound and Haast. The new South Island road is expected to cover 110km-138km and close to 80km will be located in Southland district. Travelling time between Haast and Milford Sound will be reduced by four to five hours once the new road is completed.

Related Content

  • India to upgrade roads linking it to Bangladesh, Bhutan and Nepal
    September 21, 2016
    India has approved an ambitious US$1.04 billion project for constructing and upgrading 558km of roads to link it with Bangladesh, Bhutan and Nepal. India's Department of Economic Affairs has agreed to the project that will have 50% funding from the Asian Development Bank. A report by India’s independent newswire agency IANS noted that the work will be done within two years. "We have taken up five highway stretches in the country, which are very important for such a connectivity to succeed. This project i
  • Ireland’s €2 billion motorway linking Cork and Limerick
    July 5, 2024
    Ireland is planning €2 billion motorway linking Cork and Limerick
  • New Finland-Sweden bridge proposed
    July 16, 2024
    A bridge costing up to €2 billion linking Finland and Sweden is being proposed.
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.