Skip to main content

New firm to manage US$181.84mn New Zealand road project

In New Zealand, Westland District Council has established Westland Properties to manage a US$181.84 million (NZD 220 million) road project between Milford Sound and Haast. The new South Island road is expected to cover 110km-138km and close to 80km will be located in Southland district. Travelling time between Haast and Milford Sound will be reduced by four to five hours once the new road is completed.
November 8, 2013 Read time: 1 min
In New Zealand, Westland District Council has established Westland Properties to manage a US$181.84 million (NZD 220 million) road project between Milford Sound and Haast. The new South Island road is expected to cover 110km-138km and close to 80km will be located in Southland district. Travelling time between Haast and Milford Sound will be reduced by four to five hours once the new road is completed.

Related Content

  • US$410mn ADB loan to build second Vietnam Southern Highway
    August 14, 2013
    The Asian Development Bank (ADB) is to lend US$410 million to Vietnam for the construction of the Second Southern Highway that links Ho Chi Minh City and the Mekong Delta. The arterial highway will consist of two cable-stayed bridges measuring a total of 5km, and 26km of interconnecting roads and associated access. The interconnecting roads and two bridges are expected to reduce the three-and-a-half hour travel time between Long Xuyen and Ho Chi Minh City by an hour, while the 90-minute travel time between
  • Asset management can be optimised with new technology
    August 22, 2013
    An array of asset management technologies and capabilities are now available to help clients optimise infrastructure assessments. Global survey and geotechnical group, Fugro, has signed a multi-year agreement with Dutch pavement consultant, KOAC•NPC. This move will see the firms combine capabilities to undertake highway surface condition contracts in the Netherlands. Under the agreement, Fugro will collect surface condition data using its ARAN road scanning vehicle. KOAC•NPC, will carry out the post pro
  • Managing urban motorway complexity in Sydney
    October 4, 2012
    Sydney’s Hills M2 motorway is being widened while still carrying traffic and meeting tough environmental criteria More than 100,000 vehicles and over 27,000 bus commuters use the Hills M2 motorway on a typical workday, making it one of Sydney’s busiest motorway corridors. Owned and managed by Hills Motorway Ltd (HML) and a key part of the city’s orbital motorway network, the road stretches over 21km, providing a seamless link between the Lane Cove Tunnel and Westlink M7. The Hills M2 Upgrade is one of many
  • IL&FS get LoI for US$263.9mn Kiratpur Ner Chowk Expressway contract
    March 15, 2013
    Kiratpur Ner Chowk Expressway has given IL&FS Engineering Services (IL&FS) a letter of intent (LoI) for an engineering, procurement and construction (EPC) contract in India worth US$263.9 million (INR 14.36bn). Under the deal, IL&FS will undertake a scope of work including minor bridges, five tunnels, 18 major bridges, toll plazas, 67.3km of road work and related infrastructure. The expressway project includes the EPC contract as well as expanding the Kiratpur Ner Chowk section of the National Highway 21 in