Skip to main content

New expressway for the Philippines under construction

A new expressway link in the Philippines is now under construction. The US$241.6 million South Luzon Tollway (SLTC) project will feature six separate sections. Work is due for completion in 18 months. The new route will cut journey times on the route between Santo Thomas and Barangay Mayao from three hours at present to just 45 minutes.
April 2, 2019 Read time: 1 min

A new expressway link in the Philippines is now under construction. The US$241.6 million South Luzon Tollway (SLTC) project will feature six separate sections. Work is due for completion in 18 months. The new route will cut journey times on the route between Santo Thomas and Barangay Mayao from three hours at present to just 45 minutes.

Related Content

  • New Philippines expressways being built
    March 20, 2020
    New expressways are being built in the Philippines to improve transportation.
  • Philippines implementing transport projects
    March 3, 2017
    A series of major highway projects are now being implemented in the Philippines. Key projects being implemented close to Davao City include the US$380 million Davao City-Panabo City bypass, the $537.5 million Coastal Road and two flyovers worth $14 million in total. The bypass project will cut journey times and includes the construction of a tunnel section, with a portion of the funding being provided by the Japan International Cooperation Agency (JICA). The new coastal route will also cut congestion and jo
  • Philippines expressway project under construction
    April 5, 2019
    Construction is now underway for the 27km Cavite stretch of the Cavite-Laguna-Expressway (CAVEX) project in the Philippines.
  • Philippines expressway connector project under construction
    March 11, 2019
    Construction work is starting in the Philippines for the new link that will connect the North Luzon Expressway (NLEx) and the South Luzon Expressway (SLEx). The project is costing nearly US$430 million, with the link being built by local toll road firm NLEX Corp. The new link road will be 8km long, running from the end of Harbor Link in Caloocan City to the Polytechnic University of the Philippines (PUP) in Santa Mesa of Manila. The road link will be elevated and the work is due for completion in 2021.