Skip to main content

A new expressway link for Vietnam

A new 225km expressway link in Vietnam will help boost connectivity between the Mekong Delta area in the south east of the country and Ha Tien Province. The project for the Ha Tien-Rach Gia-Bac Lieu expressway is expected to cost US$1.2 billion. The expressway will feature two lanes in either direction and will also connect with Vietnam’s National Highway 1A.
November 11, 2019 Read time: 1 min

A new 225km expressway link in Vietnam will help boost connectivity between the Mekong Delta area in the south east of the country and Ha Tien Province. The project for the Ha Tien-Rach Gia-Bac Lieu expressway is expected to cost US$1.2 billion.  The expressway will feature two lanes in either direction and will also connect with Vietnam’s National Highway 1A.

Related Content

  • Vietnam’s mountain highway improvement project
    December 17, 2018
    A 198km stretch of highway in northwestern Vietnam is to be upgraded. The route forms part of the Greater Mekong Subregion (GMS) Kunming-Hi Phòng Transport Corridor. A loan worth US$188 million from the Asian Development Bank (ADB) will help pay for the work. The highway runs through a mountainous region and is important to Vietnam as it provides a connection between Hà Ni and China's Yunnan province. The work will improve the existing road connections and boost connectivity for Vietnam’s northern provinces
  • Vietnam bridge, road and highway development projects
    June 20, 2018
    Vietnam is pushing ahead with a series of road, highway and bridge projects that will improve the country’s transport network. Feasibility studies for three stretches of the North-South Expressway have been received by Vietnam’s Ministry of Transport (MoT). The 29km stretch from Nha Trang to Cam Lam is expected to cost US$177.9 million, with work starting in 2019 and due for completion in 2021. The 60km stretch from Dau Giay to Tan Phu will be built from 2018 to 2022. The 101km stretch from Vinh Hao to Pha
  • Vietnam’s North-South Expressway project being prioritised
    December 17, 2018
    The Vietnamese Government is prioritising construction of the country’s North-South expressway project. Contractors are already being selected for the 11 sub-projects for the expressway, which is expected to come with a final pricetag of US$5.09 billion. The 2,100km route is being built in three separate phases and links 32 of Vietnams cities and provinces. The first 650km section will be complete by 2020. The other sections should be ready for traffic by 2025.
  • Vietnam’s North-South highway section given go-ahead
    September 21, 2018
    The Vietnamese Government has given the go-ahead for work on a key section of the country’s North-South highway project. This 7.5km stretch of the route will run between District 2's National Highway 22 and Hiep Phuoc Industrial Park. The work will cost US$365.4 million to carry out as it includes building the Phuoc Kieng, No 1, Rach Dia and Ba Chiem bridges. Located just to the south of Ho Chi Minh City, the Hiep Phuoc Industrial Park is in a delta area, which will require the construction of the bridge se