Skip to main content

New Danube crossing for Serbia

In Serbia plans are moving ahead with work on the Zezeljev Bridge. The structure will provide a new crossing over the Danube River for the city of Novi Sad. The new bridge replaces an old structure carrying both rail and road links that was destroyed by bombing in 1999. Construction of the new bridge forms part of an EU strategy for the Danube Region. The current cost of the new bridge has not been disclosed although an estimate in 2010 pegged the pricetag at some €60million. The 470m long by 25m wide struc
July 14, 2014 Read time: 1 min
In Serbia plans are moving ahead with work on the Zezeljev Bridge. The structure will provide a new crossing over the Danube River for the city of Novi Sad. The new bridge replaces an old structure carrying both rail and road links that was destroyed by bombing in 1999. Construction of the new bridge forms part of an 3287 EU strategy for the Danube Region. The current cost of the new bridge has not been disclosed although an estimate in 2010 pegged the pricetag at some €60million. The 470m long by 25m wide structure carries provision for road, rail, cycling and pedestrian use and the project also includes constructing new access roads. The replacement project was delayed initially by subsurface wreckage from the old structure, which had to be removed.

For more information on companies in this article

Related Content

  • Athabasca’s Hwy 813 bridge to be replaced
    May 16, 2022
    The new bridge over the Athabasca River in the Canadian province of Alberta will include two 3.7m-wide lanes with 1.8m-wide shoulders on either side as well as a pedestrian sidewalk.
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past