Skip to main content

New crossing planned for Kerch Strait

Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnel
June 10, 2014 Read time: 2 mins
Plans for a new crossing for the Kerch Strait are now moving forward. The Russian roads company 3974 Avtodor is in charge of the project, which calls for the building of both road and rail connections. As series of options are being considered and in all the work is expected to cost in the region of US$8.2-$10.9 billion. There are eight options being investigated at present, with five looking at bridges to carry both road and rail and a further three for combined connections with bridges for the roads and tunnels for the rail links. The least costly option is for a twin deck bridge carrying road and electric rail links with two lanes of vehicle traffic in either direction on one deck and twin tracks on the other. The most costly option will be for a bridge carrying twin traffic lanes in either direction as well as a tunnel for the twin track rail connection. A feasibility study is being carried out by the Giprotransmost Institute, which will be completed by November 2014. This study will determine the project costs more accurately, allowing Avtodor to decide on which of the eight alternatives will be selected.

This is not the first bridge to be constructed across the Kerch Strait. Russian forces built a rail connection across the Kerch Strait, which was opened in late 1944 and carried troops. However the bridge was destroyed by ice flows in early 1945 and it was not rebuilt. There have been plans to build a bridge across the Kerch Strait since the collapse of this first structure, however these have been hampered by the sometimes difficult relations between the Ukraine and Russia. The problems between the two nations reached a head in 2003 over the disputed territory of Tuzla Island, lying in the Kerch Strait, due in part to the construction of a dam linking Russia to the island.

The project to build road and rail links has since been revived although it is not clear how the most recent spate of troubles between Ukraine and Russia will affect plans for the road and rail link.

For more information on companies in this article

Related Content

  • Ireland and Scotland link?
    March 1, 2018
    Politicians in Northern Ireland have again raised the prospect of bridge to link western Scotland the Irish island, according to media reports. The road and rail crossing as envisaged by the Democratic Union Party would cost close to €23 billion. It would run between the Irish town of Larne in County Antrim and the Dumfries and Galloway coastline in Scotland. The DUP said in its manifesto for the 2015 UK general election that there should be a feasibility study into building a bridge or tunnel.
  • Messina Strait crossing proposed
    September 14, 2020
    A new Messina Strait crossing project is being proposed for Italy.
  • Russia’s key bridge link for Kerch Strait
    February 27, 2018
    Russia’s Ministry of Economic Development has said that the Kerch Bridge now looks likely to open to traffic in December 2018. In addition to the bridge, the highway connections should also be complete within the same timeline. The Kerch Strait bridge crossing is of key importance to the area and will help reduce journey times for drivers, as well as reducing transport costs considerably. Construction has not been without its challenges due in part to the fierce winter conditions. This is not the first
  • Consultation soon for Vancouver area’s Massey Tunnel replacement
    September 19, 2019
    The Canadian province of British Columbia could put options for a Massey Tunnel replacement out to consultation late this year or early next. A statement from the BC ministry of transportation and infrastructure said the government is in discussions with various stakeholders about which options it will put out for consultation. Whatever option is chosen to replace the ageing four-lane Massey Tunnel – be it a bridge or another tunnel – it will be will be either six or eight lanes, according to the gove