Skip to main content

New Colombian bridge to set records

The Pumarejo Bridge project in Colombia will beat records for Latin America when complete at the end of 2019. Measuring 38.1m in cross-section, it will be the widest bridge in Latin America when it opens to traffic and will measure 3.24km-long. The bridge will have three lanes in either direction, as well as provision for cyclists and pedestrians. The construction work is being carried out by the consortium SES Puente Magdalena, headed by Spanish company Sacyr and also including the Colombian contractor, Es
April 30, 2019 Read time: 1 min
The Pumarejo Bridge project in Colombia will beat records for Latin America when complete at the end of 2019. Measuring 38.1m in cross-section, it will be the widest bridge in Latin America when it opens to traffic and will measure 3.24km-long. The bridge will have three lanes in either direction, as well as provision for cyclists and pedestrians. The construction work is being carried out by the consortium SES Puente Magdalena, headed by Spanish company 3959 Sacyr and also including the Colombian contractor, Esgamo Ingenieria Constructores.

For more information on companies in this article

Related Content

  • Colombia: more money for Toyo Tunnel Project
    April 4, 2024
    The Toyo Tunnel Project – the Guillermo Gaviria Echeverri Tunnel Project - covers 18.3km including new roads and is under construction by Consorcio Antioquia al Mar.
  • New bridges for Belgrade
    February 27, 2012
    Work is now underway in Serbia to build a new bridge over the Danube River.
  • US$4 billion bridge and highway project
    June 14, 2024
    A US$4 billion bridge replacement and highway upgrade project is planned for the US.
  • Third phase for Colombia’s complex PPP project
    September 15, 2017
    Work is underway on the third stage of Colombia’s Bogota-Villavicencio road project. This 24km project is being carried out under the PPP model by the concession holder, Concesionaria Vial Andina (Coviandina). The project is complex and includes the construction of seven tunnels in all, which have a total length of 10.7km, as well as 21 bridges and overpasses measuring 3.8km in all. Coviandina has bored around 930m of the total tunnel length at present.