Skip to main content

New causeway upgrade commencing in Saudi Arabia

Work to widen the King Fahd Causeway in Saudi Arabia is commencing shortly. The US$533.3 million project will take five years to complete. The work involves building two islands of 400,000m2 apiece and featuring some 48 two way lanes so as to be able to process 4,000 vehicles/hour as well as waiting areas for trucks and buses.
April 8, 2014 Read time: 1 min
Work to widen the King Fahd Causeway in Saudi Arabia is commencing shortly. The US$533.3 million project will take five years to complete. The work involves building two islands of 400,000m2 apiece and featuring some 48 two way lanes so as to be able to process 4,000 vehicles/hour as well as waiting areas for trucks and buses.

Related Content

  • Sanibel Causeway restoration completed
    June 2, 2025
    US$328m project restores Florida causeway devastated by Hurricane Ian in 2022
  • Automated vehicle locators a must for Saudi Arabia taxis
    September 11, 2012
    Taxis in Saudi Arabia must equipped with an Automated Vehicle Locators (AVL) system, as part of new regulations set to be introduced on 22 October, 2012. The AVL will record the drop-off and pick-up location of the taxis as well as their driving speed. Taxi firms will also need to include minimum third-party insurance coverage for each driver and vehicle.
  • Summit to show US $ 300bn Saudi infrastructure opportunities
    September 6, 2012
    Representatives from leading global construction equipment manufacturers are among those being urged to attend a summit where they can learn how to get involved in US $ 300 billion worth of infrastructure projects, including major road building works, set to take place in Saudi Arabia. The Saudi Mega Infrastructure Projects Summit, being held between 16 and 18 September, 2012
  • BarrierGuard’s successful New Zealand highway installation
    March 10, 2014
    Highway construction in the vast and varied Australasian landscape can be fraught with difficulties. Distance, extreme weather conditions and topographical challenges can all play a part in creating significant obstacles for design engineers. BarrierGuard 800, a state-of-the-art lightweight steel road safety barrier, is said to be proving invaluable in two ongoing projects setting new benchmarks for their respective regions. The US$895.7 million (AUS$1 billion) Gateway WA Perth Airport and Freight Acces