Skip to main content

New cable-stayed bridge for China’s Jiangsu Province

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.
January 14, 2019 Read time: 1 min

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.

Related Content

  • First half of Renfrew Bridge arrives by barge
    May 10, 2024
    VIDEOS: Graham Construction is building the swing Renfrew Bridge for Renfrewshire Council, Scotland, as part of the €137m Clyde Waterfront and Renfrew Riverside development project.
  • VIDEO: Gap closed for Gordie Howe Bridge
    July 26, 2024
    A 26m gap in the deck was recently closed on the bridge that will connect Detroit in the US state of Michigan and Windsor in the Canadian province of Ontario.
  • Scotland’s Queensferry Crossing opens to traffic
    August 30, 2017
    The new Queensferry Crossing in Scotland is now open to traffic, with the first vehicles crossing at 2am this morning. The landmark design has set precedents in engineering, its three 207m high towers making it the tallest of its type in the UK and at 2.7km, also the longest three tower cable-stayed bridge built anywhere in the world. The bridge has a design life of 150 years and features two traffic lanes in either direction, as well as emergency lanes on either side. The new bridge will help reduce the ch
  • New Montenegro bridge – close to completion
    August 23, 2018
    Construction work on the Moracica bridge project in Montenegro is now close to completion. Measuring 960m long, the bridge spans the Moraca River Canyon and is the most complex portion of the 41km first section to be built for the new highway connecting Bar with Boljare. Work on the bridge is expected to be complete by April 2019 and the structure is being built using some 30,000m3 of concrete and 5,200tonnes of reinforcing steel. The tallest of the bridge’s five piers will measure 158.5m in height, with