Skip to main content

New cable-stayed bridge for China’s Jiangsu Province

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.
January 14, 2019 Read time: 1 min

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.

Related Content

  • Cleveland Bridge: monuments of culture, bridges that define
    July 2, 2021
    Bridges – many designed and renovated by Cleveland Bridge – are part of a city’s architectural landscape. They help define an urban area’s identity, as Carlos Arias*, the company’s international manager, explains in this special feature.
  • Germany plans replacement for A40 Neuenkamp Duisburg Bridge
    March 6, 2018
    Germany’s motorway authority has unveiled plans for an 802m cable stayed replacement bridge taking the A40 over the Rhine River near Duisburg. The state owned authority Deges - Deutsche Einheit Fernstraßenplanungs- und -bau - will oversee the project that includes an eight-lane expansion of the A40, all in the industrial Rhur region.
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of