Skip to main content

New cable-stayed bridge for China’s Jiangsu Province

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.
January 14, 2019 Read time: 1 min

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.

Related Content

  • $270 million Tanzania bridge opens
    July 2, 2025
    A $270 million bridge has opened in Tanzania.
  • New safety barrier solutions protect road users
    February 21, 2012
    Novel safety barrier solutions are coming to market, writes Mike Woof The safety barrier market is a focus for innovative products designed to meet a range of different applications. The diverse range of vehicle types on the road poses numerous technical challenges to barrier manufacturers. At the same time, different applications such as motorcycle safety, end treatments, bridge barriers and roadside obstacle protection require novel solutions. Although motorcycles account for only a small proportion of ve
  • Romania’s important bridge project
    October 5, 2022
    Romania’s important Braila Bridge project will deliver a key crossing spanning the Danube River
  • Morocco’s big bridge for Rabat bypass
    January 9, 2015
    Construction work is on track with the new cable-stayed bridge close to Morocco’s coastal city of Rabat. The cable-stayed bridge will form part of Rabat’s new bypass and will be the largest such structure in Africa when it is complete, later this year. The bypass crosses the Bouregreg valley and measures some 41km. The bridge itself will measure 950m and span 376m, with three lanes in each direction. Construction of the bridge has been financed by the World Bank and Autoroutes du Maroc (ADM) and is costing