Skip to main content

New cable-stayed bridge for China’s Jiangsu Province

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.
January 14, 2019 Read time: 1 min

A new cable-stayed bridge is being built in China’s Jiangsu Province. The 1,176m-long bridge will span the Yangtze River. The bridge is featuring an innovative design and its construction will utilise new technologies and novel use of materials. The bridge itself forms part of a 5.3km-long crossing over the river. This crossing will include a road crossing on its upper level with multiple lanes and a rail crossing with several tracks on its lower level.

Related Content

  • Bolivia’s new highway
    October 10, 2017
    Bolivia’s new highway will provide better access into mountain areas – Mauro Nogarin writes At the beginning of 2015, work began on the construction and paving for the Tupiza - Atocha - Uyuni highway project. The route is located in Bolivia’s Potosí department: it is 189m in length and forms part of the Southwest Basic Road Network (RVF) of Bolivia. The completion of this important route is requiring funding worth US$150 million, of which 72% is being delivered through loans from the European Investment
  • I Lift NY crane places first girder on New York’s Tappan Zee Bridge
    June 25, 2015
    One of the world’s largest cranes has placed the first steel girder assembly for the approach span of the new NY Bridge, often called the Tappen Zee Bridge in New York. The barge-mounted I Lift NY super crane with its nearly 100m boom slowly picked up the 125m unit from its delivery barge and gently lowered it onto concrete pedestals in the Hudson River, near the Rockland County side of the bridge. The super crane will install even larger sections of the new bridge, some of which weigh around 907tonne
  • Renovation set for the Freihafenelbbrücke
    March 4, 2021
    Freihafen Bridge opened in 1926 to improve transportation near the then Hamburg Free Port.
  • Second giant moveable scaffolding system set for Mersey Gateway
    May 4, 2016
    A second movable scaffold system (MSS) is on its way from China to the UK town of Halton, as part of the Mersey Gateway Project, a toll bridge over the Mersey River in England. The machine will be used to build the south elevated approach viaduct that will connect the main road network in the town of Runcorn to the Mersey Gateway Bridge, now under construction.