Skip to main content

New Bulgaria-Romania Danube crossings

The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020
October 28, 2014 Read time: 1 min
The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020 as the link forms part of a European transport corridor.

Related Content

  • Romania retenders Lugoj-Deva section of A1
    April 20, 2022
    The Lugoj-Deva segment has been troublesome, with landslides halting work at least twice.
  • New Danube crossing for Serbia
    July 14, 2014
    In Serbia plans are moving ahead with work on the Zezeljev Bridge. The structure will provide a new crossing over the Danube River for the city of Novi Sad. The new bridge replaces an old structure carrying both rail and road links that was destroyed by bombing in 1999. Construction of the new bridge forms part of an EU strategy for the Danube Region. The current cost of the new bridge has not been disclosed although an estimate in 2010 pegged the pricetag at some €60million. The 470m long by 25m wide struc
  • Romania ring road project
    September 3, 2019
    A new ring road project is planned for Romania. The work will be carried out in the city of Galati, which lies close to Romania’s borders with the Ukraine and Moldova, in the east of the country. Funding from the EU will help pay for the work. The project comes with an estimated pricetag of €1.2 billion while the construction work is expected to take 40 months. The new route will connect the DN25 and DN26 routes with the E87 highway. The work includes building bridges. Galati lies on the lower reaches of th
  • Danube bridge funding in danger
    May 15, 2012
    The EU is warning Bulgaria that €200 million in funding for the second Danube bridge project may be withdrawn if the work is not finished by the close of 2010. The EU is now considering whether to extend the projects deadline and the contractor building the bridge estimates that the work will not be completed until mid-2011. If funding is withdrawn, Bulgaria's Ministry of Transport hope to seek some financing from the European Investment Bank as well as the Bulgarian state budget.