Skip to main content

New Bulgaria-Romania Danube crossings

The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020
October 28, 2014 Read time: 1 min
The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020 as the link forms part of a European transport corridor.

Related Content

  • Lower Thames Crossing contractor shortlist
    September 27, 2021
    The contractor shortlist has been announced for part of the Lower Thames Crossing.
  • Europe-Asia road link
    February 9, 2017
    The governments of China, Kazakhstan, Belarus and Russia have finally approved a project for the building of a new transcontinental road, which will connect Asia and Europe. The new route is much-needed and will speed the transportation of cargo between the two continents, according to Maxim Sokolov, Russia’s Minister of Transport. The idea for the building of the road was first proposed by the European Commission around 2005. It was prompted by the ever growing volume of trade between the EU and Chin
  • Romania to start work on the Sibiu-Pitesti A1 section in 2017
    April 17, 2015
    Work will start on the 120km Sibiu-Pitesti section of Romania’s A1 Freeway in 2017, Romanian media report. Around €1.6 billion will be spent on the route that will run through 20km of mountains. In February, the National Highway and Roads Company, CNADNR, selected the Milan-based Spea Ingineria Europea and Tecnic Consulting Engineering of Romania to update the feasibility study on the section, which is part of Romania’s A1 Freeway. But that contract has been challenged and will be scrutinised by th
  • Innovate, invest, connect: the path to sustainable roads in Europe & Central Asia
    November 26, 2024
    The IRF Global held its second Europe & Centra Asia Congress in Bulgaria.