Skip to main content

New Bulgaria-Romania Danube crossings

The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020
October 28, 2014 Read time: 1 min
The Bulgarian and Romanian Governments have agreed over projects to build new bridges crossing the Danube River and linking the country. One of the two bridges will be constructed between Nikopol and Turnu Magurele while the other will connect Silistra and Calarasi. Funding for the projects will be provided by the Cross Border Cooperation Programme Bulgaria-Romania 2014-2020. The work to upgrade to the existing bridge at Ruse-Giurgiu will be included in the EU's operational transport programme for 2014-2020 as the link forms part of a European transport corridor.

Related Content

  • Transforming Algeria's road network
    April 4, 2012
    Highway construction work is transforming Algeria, providing the country with a new network of highway quality road connections. Several sections of the new trans-Algerian highway are already complete and carrying traffic, such as the stretch near the town of Setif. When complete the highway will run 1,200km across the north of the country from the border with Morocco in the west to the Tunisian border, passing through 24 provinces. This makes it the biggest highway project ever undertaken in Africa, as wel
  • Four offers for Sibiu-Pitesti A1 motorway Lot 4 section
    September 4, 2019
    Main Site Taxonomy WH5 Sub Taxonomy ES08 Image supplied No Needs XSP Romania’s national road agency reports that it has four offers for both the design and construction of Lot 4 of the Sibiu-Pitesti A1 motorway. The National Company for the Administration of Road Infrastructure (CNAIR) said the value of the deal is around €427.5 million. Construction is likely to take 60 months - 16 months for design work and 44 for construction. The bidders are from China, Turkey, Austria and Italy. Lot
  • US$700 million for new Argentina bridge
    November 27, 2023
    A US$700 million loan is helping pay for new bridge in Argentina.
  • Doka wins Fehmarnbelt Tunnel formwork deal
    November 17, 2022
    When completed in 2029, the Fehmarnbelt Tunnel between Denmark and Germany will accommodate a four-lane highway, as well as a two-track electrified rail line.