Skip to main content

New bridge for St Petersburg

A new US$181.7 million bridge is due to be built in the Russian city of St Petersburg.
March 2, 2012 Read time: 1 min
A new US$181.7 million bridge is due to be built in the Russian city of St Petersburg. The bridge will span the Bolshaya Nevka River and provide a link to Novo-Admiralteysky Island. The bridge is due for completion in the third quarter of 2013 and will be 265m long, while it will allow a 40m height clearance for vessels navigating the river. The work is being handled by Russian contractor 2964 Mostostroy No6, which won the tender process recently.

For more information on companies in this article

Related Content

  • Increased spending for St Petersburg roads
    May 21, 2012
    The authorities in the Russian city of St Petersburg will spend some US$514.6 million on road construction and reconstruction during 2012. The city authorities will use public and private partnerships to push ahead with planned road infrastructure projects. Private investors will be invited to participate in construction of two highways with bridges across the Neva River, a highway with a bridge at the intersection of Fayansovaya and Zolnaya streets, and the Northern highway #7 connecting Arsenalnaya embank
  • Opening St Petersburg's key tollway ring road
    May 15, 2012
    A new section of Western High Speed Diameter (WHSD) highway from the Ring Road (KAD) to the Hyundai plant in Kamenka, has been opened to traffic in St Petersburg. The WHSD and KAD interchange will be completed by 2012 when the entire third phase of the highway will be built. The US$7.23 billion WHSD Tollway in the city is sponsored by the Federal Road Agency and it is said to be one of the most important means of solving the city’s transport problems. It is a strategic investment project to develop the ci
  • Work on St Petersburg bridge project
    June 20, 2016
    Contractor ICA Construction used two Aquajet robotic hydrodemolition machines at the top of a 120m-high bridge pylon located in the city of St Petersburg. The two Aquajet robotic water cutters were used to remove surplus concrete from around the inner steel structure of the bridge pylon. This link spans the River Neva and forms part of the Western High-Speed Diameter (WHSD) route in St Petersburg. The WHSD is a highly important route for the region and will provide a key connection between the Scandinavi
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.