Skip to main content

New bridge spanning Red River for Vietnam

A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.
October 28, 2014 Read time: 1 min
A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.

Related Content

  • Vietnam’s major road and bridge projects
    September 27, 2021
    Work continues for Vietnam’s major road and bridge projects.
  • Multi-billion dollar Vietnam transport projects to be supported by ODA of Japan
    December 16, 2013
    A total of 29 transport projects costing a combined US$7.42 billion, including the Phan Thiet-Nha Trang road, will be carried out in Vietnam from 2013 until 2016, according to the country’s Ministry of Transport. Of the 29 projects, 18 projects worth $2.34 billion collectively were due to be commissioned by the end of 2013. The ministry has said that the projects are supported by the government of Japan through $6 billion of ODA funds, including around $774.59 million for 2013. The Quang Ngai-Danang and D
  • Quang Ninh agrees to SE's new draft for Bach Dang Bridge in Vietnam
    October 18, 2012
    Vietnam's Quang Ninh province has backed a new design proposed by Japanese developer SE Group for the 4.3km Bach Dang Bridge. The new design will change the original prestressed concrete bridge design to a steel cable-stayed bridge. The modification will lower the girder height, reduce the bridge length and alter the main span length. The altered draft is awaiting final approval from the authorities. SE Group has also requested to cut the expenses for the project to US $ 386 million from $ 483 million. The
  • New bridges and roads in Vietnam
    April 30, 2025
    New bridges and roads in key Vietnamese cities worth up to $2.43 billion will boost transport.