Skip to main content

New bridge spanning Red River for Vietnam

A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.
October 28, 2014 Read time: 1 min
A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.

Related Content

  • New Chinese road projects
    August 17, 2020
    Major new Chinese road projects are being planned.
  • Russia to commission new Moscow-St Petersburg highway by 2020
    June 20, 2017
    Final delivery of the final stretch for Russia’s key highway project looks set to be delayed – Eugene Gerden writes. I now looks as if Russia’s most ambitious project in the field of road building in recent years, the building of a new high-speed road link between Moscow and St Petersburg, the country’s largest cities, will not be complete in time. The project was set up by the Russian government and several private investors. According to initial state plans, building of the new road should have been compl
  • Vietnam: North-South Expressway bidding
    November 17, 2022
    The package for the Can Tho-Hau Giang section has the biggest value, at US$320 million.
  • New bridge projects underway in Vietnam
    December 14, 2015
    Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.