Skip to main content

New bridge spanning Red River for Vietnam

A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.
October 28, 2014 Read time: 1 min
A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.

Related Content

  • Turkey is investing in new motorway and bridge projects
    May 29, 2013
    Turkey is benefiting from new motorway and bridge projects constructed along the BOT model - Gülay Malkoç. Looking at Turkey’s economic development, road construction plays a crucial role. The investment in Turkey is becoming increasingly attractive for both local and foreign investors. There are significant huge road investments and projects being made in Turkey at present, compared with EU countries where the roads need mostly repair and maintenance. According to the approach of Turkey’s Ministry of Trans
  • US$12.85 billion for new Chinese highways
    September 17, 2024
    New Chinese highways worth US$12.85 billion are being planned.
  • Vietnam’s new highway connection project moving forward
    October 10, 2017
    Vietnam is planning to construct a new expressway in Hoa Binh and Son La provinces in the north of the country. The project is expected to cost US$2.21 billion and will be carried out in two stages under the PPP model. The route runs of 189.5km, with an 85.4km stretch from Hoa Binh to Moc Chau due for completion in 2020. A further 104.1km section will be built later.
  • Ecuador’s new bridge to be built in sections
    July 31, 2018
    Ecuador is working on plans for the new South Crossing Bridge (SCB) spanning the Guayas River, to improve transport connections for the port of Guayaquil. The plans call for the SCB to be constructed in three sections, with the project expected to cost US$1.04 billion. The schedule calls for the link to be completed in 2022, with work starting in the third quarter of 2018. The project is being handled under 40-year concession deal that encompasses the bridge and highway links.