Skip to main content

New bridge spanning Red River for Vietnam

A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.
October 28, 2014 Read time: 1 min
A new 2.85km bridge is being built in Vietnam to span the Red River at Hung Ha. The Thai Ha Bridge will connect Thai Binh Province and Ha Nam Province with the Ninh Binh highway in Cau Gie Province. The link will be constructed under the build-operate-transfer model and the concession deal means that from 18th October 2016, investors will collect toll revenues from the bridge for 19 years and two months. The highway itself will feature four lanes with a maximum travel speed of 80km/h.

Related Content

  • Vietnam highway building being speeded up
    August 22, 2017
    Vietnam’s Ministry of Transport is to prioritise construction of the new North-South Expressway. The project will provide a much improved connection between the country’s north and south, speeding transport and boosting safety. It will feature from four to six lanes and have speed limits ranging between 80km/h and 120km/h. The cost of the project is expected to be US$13.75 billion, with 17 of the 20 work packages being carried out under the build-operate-transfer model.
  • Highway upgrade underway for Vietnam
    January 9, 2014
    Work is underway on an important highway improvement scheme in Vietnam. The project involves upgrading the Gia Lai-Binh Dinh section of National Highway 19. The work is being carried out under the build-operate-transfer (BOT) model. The actual construction work is scheduled for completion during 2015. The project is costing US$95 million and involves work to a 56km section of the route. The concession package has been agreed under a 22 year deal.
  • US$366 million Vietnam coast road approved
    May 29, 2025
    Phan Thiet City project will include bridges over Ca Ty and Phu Hai rivers
  • Vietnam to slash almost US$39 million road projects
    August 18, 2015
    An approval has been granted by the prime minister to scale down and slash investment for a road project linking Hai Phong-Hanoi and Cau Gie-Ninh Binh motorways in Vietnam. In 2011, work on the project started and within 2015, it is anticipated that the project will reach completion. Due to a capital squeeze, investment on the project will reach nearly US$212 million, a cut of almost $39.64 million. By 2017, stage one of constructing two traffic lines will be completed.