Skip to main content

New bridge to span Okavango River in Botswana

A new bridge is planned that will span the Okavango River in northern Botswana. The bridge will feature a cable-stayed structure and will be 1.2km long in all, with a 400m central section. The project also includes the construction of 3km of roads to connect the new bridge to existing road infrastructure, as well as installing necessary lighting and drainage systems. The project is expected to cost in excess of US$93 million and take three years to complete.
October 17, 2016 Read time: 2 mins
A new bridge is planned that will span the Okavango River in northern Botswana. The bridge will feature a cable-stayed structure and will be 1.2km long in all, with a 400m central section. The project also includes the construction of 3km of roads to connect the new bridge to existing road infrastructure, as well as installing necessary lighting and drainage systems. The project is expected to cost in excess of US$93 million and take three years to complete.

The bridge site lies close to Botswana’s border with Namibia just to the north and the project will improve transport connections between the two countries. The new link will also improve connections through to Angola as well as Zambia, as both countries have southern borders with Namibia within a comparatively short distance of the bridge location. As a result, the project will help boost international trade within the region. The construction work for the bridge will be carried out by the joint venture partners Itinera and Cimolai.

Related Content

  • Burundi’s bridge lifeline project
    April 23, 2025
    Burundi’s new road bridge project will provide a key lifeline.
  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.
  • India’s longest tolled expressway is open to traffic
    January 2, 2013
    Earlier this year, a new expressway was opened to traffic in India, adding connectivity to the country’s road network - Mike Woof reports. India’s economic growth has fuelled a massive construction boom in the country. Road building has been set as a priority by the Indian Government to help ensure continued economic development and improve connectivity between major population centres. One major new expressway has recently opened to traffic, having been designed to international standards and provides insi