Skip to main content

New bridge projects underway in Vietnam

Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.
December 14, 2015 Read time: 1 min
Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.

Related Content

  • Project plans in Vietnam
    May 30, 2012
    Feasibility studies have been carried out for the No 3 and No 4 beltway projects in Vietnam. The studies were carried out by State-owned firm Transport Engineering Design Inc in the South (TEDI South). These two major beltway projects will require investments pegged at an estimated US$5.35 billion in all and if work goes ahead as planned, the links should be ready for use in 2016. The 148km No 4 beltway will connect Ho Chi Minh City (HCMC) with towns in nearby provinces, such as Ben Luc Town and Trang Bom T
  • US$4.86 billion infrastructure works for Vietnam
    October 30, 2024
    Transport infrastructure works worth US$4.86 billion are planned for Vietnam.
  • Over US$2 billion for two Vietnam highway projects
    July 22, 2024
    More than US$2 billion will be invested for two Vietnam highway projects.
  • Japanese funding for Vietnam link
    April 19, 2012
    The Japanese SE Group is working on a new road project in Vietnam. The 25km highway is costing some US$476 million to construct, with some 60% of the funding coming from the JBIC Bank and SE Group providing around 20%. The rest of the funding will be provided by official development assistant capital. This new road will provide a link from the city of Halong in Vietnam's Quang Ninh province to the Hanoi-Haiphong highway project.