Skip to main content

New bridge projects underway in Vietnam

Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.
December 14, 2015 Read time: 1 min
Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.

Related Content

  • Greenlight for Vietnam’s Cat Lai Bridge in 2020
    September 4, 2019
    An agreement has been reached in Vietnam for construction of a bridge over the Dong Nai River close to Ho Chi Minh City. The proposed 4.5km, six-lane cable stayed structure – the Cat Lai Bridge - could cost as much as US$268 million. It would replace the Cat Lai ferry service that runs between Nhon Trach District of Dong Nai Province and District 2 of Ho Chi Minh City. The bridge would also become a major route to the international airport, according to local media. The ferry service carries on averag
  • New Chinese road projects
    August 17, 2020
    Major new Chinese road projects are being planned.
  • Controversial Russian bridge opens
    August 10, 2018
    The first stage of a controversial Russian bridge project is now complete, with the link having been opened to use by cars and buses. The Kerch Strait bridge spans the Black Sea, connecting Russia’s Taman Peninsula in Krasnodar with Crimea, the latter having been controversially annexed by Russia from Ukraine in 2014. The official opening of the 19km-long bridge was carried out by Russia’s president, Vladimir Putin, who drove across the link in a Russian-manufactured Kamaz truck to reach the city of Kerch.
  • $1.56 billion Vietnam expressway expansion delayed
    July 7, 2025
    A $1.56 billion expressway expansion project in Vietnam is delayed.