Skip to main content

New bridge projects underway in Vietnam

Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.
December 14, 2015 Read time: 1 min
Three major new bridge projects are now being carried out in Vietnam. All three of the bridges are being carried out under the build-operate-transfer (BOT) model with completion scheduled for 2018. The 3.26km Chau Doc Bridge will link the towns of Tan Chau and Chau Doc in An Giang Province. Meanwhile the other two bridges will improve the road connection between Tra Ving Province and Soc Trang Province. The Dai Nghia Bridge No1 measures 0.86km long while the Dai Nghia Bridge No2 measures 2.24km long.

Related Content

  • Vietnam highway project receiving South Korean funding?
    November 3, 2017
    Vietnam’s Belt Road Three project is being planned at present, with some of the financing still being sought. The route will run between Tan Van District and Nhon Trach District, crossing the Dong Nai River. The project is expected to cost US$2.46 billion to construct and will feature four lanes initially, with additional lanes being built in future phases. The 89.3km route has been approved and runs through the provinces of Binh Duong, Dong Nai and Long An, as well as through the outskirts of Ho Chi Minh
  • Hanoi’s $1.9 billion three new bridges
    March 10, 2025
    $1.9 billion is being spent for Hanoi’s three new bridges
  • Construction of Vietnam’s Da Nang-Quang Ngai expressway begins
    November 25, 2013
    Construction of Vietnam’s US$1.4 billion Da Nang-Quang Ngai expressway is now underway. The near 140km-long expressway will have four lanes and a speed limit of 120km/hour. It will link economic hubs like Dung Quat (Quang Ngai), Da Nang-Chu Lai (Quang Nam) and Nhon Hoi (Binh Dinh). The expressway will also have a monitoring centre, a maintenance centre and a service centre. The Vietnamese government, the World Bank and the Japan International Co-operation Agency have provided official development assistan
  • New Vietnamese expressway projects
    April 18, 2023
    New Vietnamese expressway projects are planned.