Skip to main content

New bridge project to boost transport for Vietnam port

A new bridge project is expected to boost transport in and out of a key port in Vietnam. Approval is being sought to go ahead with the bridge for the port of Haiphong, which lies on the coast close to the city of Hanoi. The project is expected to cost nearly US$304 million.
July 16, 2018 Read time: 1 min

A new bridge project is expected to boost transport in and out of a key port in Vietnam. Approval is being sought to go ahead with the bridge for the port of Haiphong, which lies on the coast close to the city of Hanoi. The project is expected to cost nearly US$304 million.

Related Content

  • Vietnam expressway project gets go ahead
    March 11, 2017
    Approval has been given for Vietnam’s Hoa Binh-Moc Chau expressway project. The go ahead has been given by Vietnam’s Government. The project has an estimated cost of US$881 million and is planned as a public-private partnership. The construction work is expected to take 42 months and the new route will connect Hoa Binh to Moc Chau. When complete the expressway will cut the journey time between Hanoi and Moc Chau by around two hours.
  • Vietnam road infrastructure plans
    February 4, 2019
    New road and bridge links are being opened to drivers in Vietnam, boosting connectivity and transport for the country. The 60km Ha Long-Van Don expressway in Quang Ninh is now open to traffic, having cost around US$514.4 million to construct. The Ha Long-Van Don expressway links the Ha Long - Hai Phong - Hanoi expressway with Van Don Airport and was built by the BOT Bien Cuong Joint Stock Company. And the 47km road stretch connecting the Hanoi-Haiphong and Cau Gie-Ninh Binh expressways is also now open to
  • Vietnam’s US$5.5 billion ring road project
    September 16, 2024
    Vietnam is planning US$5.5 billion ring road project for HCMC.
  • Japan ODA cash for Vietnam’s Tan Vu-Lach Huyen Bridge
    February 19, 2014
    Work has begun on the Tan Vu-Lach Huyen Bridge located in Hai Phong, a northern port city of Vietnam. The 5.4km long and 16m wide bridge is expected to be completed by early-2017. The structure’s total construction cost combined with the cost of a 10km road leading to it will be US$562.28 million (VND 11.85 trillion).