Skip to main content

New bridge planned to span Russia’s Ob River

A new bridge is being planned in Russia that will span the Ob River, in the Khanty-Mansi Autonomous Area in the Urals. The new 1.6km-long bridge will be the second to be constructed across the Ob River, with the first lying close to the city of Surgut. The new bridge will form part of a project to build a 44km highway section, with the new route expected to take 40 months to complete and at an estimated cost of US$645.5 million. The development of new transport infrastructure is desperately needed in the re
December 11, 2018 Read time: 2 mins

A new bridge is being planned in Russia that will span the Ob River, in the Khanty-Mansi Autonomous Area in the Urals. The new 1.6km-long bridge will be the second to be constructed across the Ob River, with the first lying close to the city of Surgut. The new bridge will form part of a project to build a 44km highway section, with the new route expected to take 40 months to complete and at an estimated cost of US$645.5 million. The development of new transport infrastructure is desperately needed in the region. Although the Khanty-Mansi Autonomous Area is comparatively sparsely populated, it provides a significant percentage of Russia’s oil and gas production. The city of Surgut is one of the most important centres for Russia’s oil and gas industry and while it sits on the R404 Federal Highway, better road links would reduce extraction costs.

Related Content

  • Khabarovsk Bypass to raise transit potential of Russian Far East
    March 13, 2017
    Khabarovsk Bypass to raise transit potential of Russian Far East – Eugene Gerden writes The Russian Government, together with the government of Khabarovsk Territory, an administrative capital of the Far East, have announced the completion of preparations for the building of a new road. The Khabarovsk Territory is located 30km from the Chinese border, at the confluence of the Amur and Ussuri Rivers. This new highway will boost the transport potential for the Russian Far East and will improve the traffic s
  • Turkey to tender for Izmir-Candarli beltway contract
    November 15, 2016
    Turkish highway authorities will tender construction of the remaining part the Izmir-Menemen-Aliaga-Candarli motorway on 15 February. The contract will be build-operate-transfer for the 76km section between the towns of Aliaga and Candarli. Constructions is expected to take three years. The 16km section between Izmir and Menemen is already finished, according to Turkish media. Up to 60,000 vehicles a day are projected to use the highway from Izmir to Candarli. It is officially called the Otoyol 30
  • Europe closes in on the crossings
    September 27, 2017
    The Mersey Gateway bridge project off England’s west coast passed a milestone recently with the first joining of two of the deck sections. The key segments, as the sections are called, link the north approach viaduct to the north pylon deck span and are the first of four deck-joins scheduled for this summer. In total, there are five sections of bridge deck and approach roads that need to be joined.
  • New highway stretches for Russia
    May 21, 2020
    New highway stretches are being planned for Russia.