Skip to main content

New bridge planned for Kenya’s port of Mombasa

Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete.
December 14, 2017 Read time: 2 mins

Planning is being carried out for the new Mombasa Gate Bridge project, which is expected to cost close to US$778 million. The bridge will connect Mombasa Island with the South Coast, replacing a ferry operation, which first began operation in 1937. The feasibility study for the 1.4km bridge is now complete and construction of the link is expected to take 36 months to complete. The project calls for the construction of a cable stayed bridge that will carry four traffic lanes and be 69m high at mid-point, leaving sufficient space for shipping to pass underneath so as to access the busy Kilindini area of the port. Mombasa’s drivers will be pleased to see the less than dependable ferry service being replaced by a bridge and the project is expected to improve transport and traffic flows in Mombasa significantly. The new bridge will run from Lumumba Road and span the Likoni Channel at Mwenza Creek and connect to the A14 at Mtongwe. Two bridges connect the north side of Mombasa Island to the mainland but the southern link at Likoni has been suffered from congestion and delays for many years with insufficient maintenance of the ferries having posed a problem in recent times.

Related Content

  • Sweden’s Tjörnbron Bridge to get replacement cables
    May 30, 2018
    SwedenSwedish contractor Svevia has been commissioned by the Swedish Transport Administration (Trafikverket) to handle cable replacements on the Tjörnbron Bridge. Replacement is expected to start in 2019 for completion by 2025. Svevia project manager Johan Söderberg said the work will be complicated, not least because traffic must continue to us the bridge. He reportedly said that much of the work will have to take place at night, in the summer and in good weather. The 664m-long cable stayed Tjörn Bridge,
  • A new tolled highway brings change for Austin, Texas
    February 10, 2020
    A new highway section in Austin, Texas marks a major departure for the southern US city
  • Cairo’s massive new bridge
    May 22, 2019
    Egyptian capital Cairo is already benefiting from the opening of a massive new bridge. features six lanes in either direction, making it the world’s widest suspension bridge. This bridge is one of several forming part of the new highway running across Egyp
  • Zipping up road lanes – with Barrier Systems
    September 10, 2018
    QMB has a Lindsay Road Zipper on duty near Montreal. World Highways deputy editor David Arminas climbed aboard As vice president of Canadian barrier specialist QMB, based in Laval, Quebec, Marc-Andre Seguin is sanguine about the future for moveable barriers. On the one hand, it looks good. The oft-stated advantage of moveable barriers is that the systems are cheaper to install than adding a lane or two to a highway or bridge. Directional changes to lanes can boost volume on a road without disrupting tra