Skip to main content

New bridge over China’s Yi River

A new bridge has been built in China that now spans the Yi River. A crane from XCMG has played a key role in the work, being used to erect the two 100m-high towers for the structure. The bridge is made from prestressed concrete and is a cable-stayed structure, with two towers providing support for the necessary cables. Building this large bridge required the use of sophisticated technology and the project team opted to use a 100m-high tower crane to help lift key elements of the structure into place. The c
December 10, 2015 Read time: 2 mins

A new bridge has been built in China that now spans the Yi River. A crane from 2490 XCMG has played a key role in the work, being used to erect the two 100m-high towers for the structure. The bridge is made from prestressed concrete and is a cable-stayed structure, with two towers providing support for the necessary cables. Building this large bridge required the use of sophisticated technology and the project team opted to use a 100m-high tower crane to help lift key elements of the structure into place.

The construction team also employed a large all-terrain crane, with a maximum hoisting capacity of 500tonnes. An XCMG QAY500 model was selected for the work, with power from a Mercedes Benz diesel engine and featuring seven boom sections with a length of 84m when extended. The crane can also be rigged with fixed king-size jibs of 56m, luffing jibs of 91m and a Y-shaped superlift structure, with torque up to 2800Nm.  A key feature of the crane is its dynamic matching hoisting technology as well as its intelligent operation system. Despite its large capacity, the machine also has a comparatively compact design and its chassis configuration allows a minimum turning radius of 15m. This allowed the crane to turn round in the confined construction site under the bridge.

For more information on companies in this article

Related Content

  • Arched bridge challenge over the Oparno
    February 29, 2012
    For environmental reasons planners decided in favour of the challenging task of constructing a 13-field arched highway bridge over the Oparno Valley in the Bohemian area of the Czech Republic. The 258m bridge, whose reinforced concrete arch has a span of 135m, straddles the valley without any bridge piers, transferring the loads in the form of compressive forces into the foundations.
  • Major project to construct landmark Bay Bridge in California
    October 31, 2012
    Iconic California crossing will offer seismic safety – Adrian Greeman reports A unique single-span single-tower suspension bridge is the iconic centrepiece of a dramatic renewal of the eastern Bay Bridge in California, crossing from San Francisco to Oakland. Tourists in San Francisco sometimes mix up their bridges, identifying as the famous Golden Gate, the double suspension bridge which runs across the wide San Francisco Bay. These serially linked bridges in fact form the Bay Bridge east to Oakland whereas
  • Potain launches self-erecting HUP cranes
    April 20, 2016
    Potain has launched a new range of self-erecting tower cranes that boast a smaller footprint and a greater lifting capacity than the Igo range it replaces. Called the HUP range, there will be two models – the HUP 32-27 is the first, with the HUP 40-30 available at the end of 2016. Where the HUP 30-27 offers a 32m jib and 27m working height, the HUP 40-30 extends to a 40m jib and 30m working height. Suited to space-restricted jobsite, the smaller HUP 32-27 comes with two footprint options - 4m x 4m or
  • Indeco cuts up New York City’s old Kosciuszko Bridge
    November 23, 2017
    An Indeco ISS 45/90 is proving essential for demolishing the old Kosciuszko Bridge in New York City. New York City’s old 1.9km Kosciuszko Bridge, which crosses Newtown Creek connecting Green Point, Brooklyn with Maspeth, Queens, has been out of service since April. By the end of the year, the polygonal Warren through-truss structure will be no more. To replace the old bridge, in 2009, the New York State Department of Transportation planned the construction of two cable-stayed replacement bridges.