Skip to main content

New bridge opening in Russian city St Petersburg

An important bridge link is opening in the Russian city of St Petersburg shortly. The Yakhtenny Bridge over the Bolshaya Nevka River in St Petersburg will open to traffic on 1st June 2017. The bridge is undergoing testing once the asphalt surface, guardrails and lighting work has been completed. The bridge is being built by contractor Pylon at a cost of some US$33 million. The new bridge will provide a link from the city’s Primorsky district to the new stadium on Krestovsky Island under construction for the
April 6, 2017 Read time: 1 min
An important bridge link is opening in the Russian city of St Petersburg shortly. The Yakhtenny Bridge over the Bolshaya Nevka River in St Petersburg will open to traffic on 1st June 2017. The bridge is undergoing testing once the asphalt surface, guardrails and lighting work has been completed. The bridge is being built by contractor Pylon at a cost of some US$33 million. The new bridge will provide a link from the city’s Primorsky district to the new stadium on Krestovsky Island under construction for the 2018 FIFA World Cup.

Related Content

  • Delay for tender for link roads to Istanbul’s new Bosporus bridge
    June 25, 2015
    The tender process for the road connections to the third bridge over the Bosporus in Turkey has been delayed once more. This is the third time the tender for the connecting roads for Istanbul's third bridge over the Bosporus has been postponed. The tender for the North Marmara Motorway was originally set for 6th March 2015 but was then pushed back to the 6th May. It was then announced that the tender would be run in two stages, with the Kinali-Odayeri motorway tender on 7th July and the Kurtkoy-Akyazi motor
  • Scotland’s new Queensferry Crossing over the Forth Estuary
    December 23, 2015
    The new Queensferry Crossing under construction in Scotland will be the third landmark bridge spanning the Forth Estuary - Mike Woof writes When the new Queensferry Crossing over the Forth Estuary opens at the end of 2016, it will be the third landmark bridge to be built spanning this short stretch of water. Lying alongside the existing road bridge and the historic rail bridge, this new structure will be as groundbreaking as the two earlier crossings were at the time of their construction.
  • Building an airport for St Helena
    August 29, 2013
    The remote South Atlantic island of Saint Helena will shortly benefit from the construction of a new airport as well as access roads and supporting infrastructure. This is the biggest construction project in the history of the island, which lies nearly 2,000km off the coast of Africa. The airport is expected to boost economic development for the island’s 4,000 residents with an estimated 20,000 people a year forecasted to visit this highly remote, 122km2 equatorial volcanic outcrop. At present the islan
  • Temporary bridge replacement in the US
    July 2, 2019
    A temporary bridge structure provided by Acrow Bridge is maintaining traffic flow for a key crossing in Vermont. The bascule bridge is allowing both vehicular and vessel traffic to pass during the reconstruction work to the North Hero-Grand Isle Drawbridge in Vermont. The US$60 million project involves replacing the historic twin leaf bascule bridge on Lake Champlain. This modular steel bascule bridge is allowing transport to continue to and from the Lake Champlain island towns of North Hero and Grand Isl