Skip to main content

A new bridge link will improve connectivity in the Ural mountains

By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.
April 16, 2012 Read time: 1 min
By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.

Related Content

  • Bangladesh, China seal $705 million deal for Karnaphuli River tunnel
    July 2, 2015
    Bangladesh has formally signed a US$705 million deal with China Communication Construction to build a multi-lane road tunnel underneath the Karnaphuli River in Chittagong. Road Transport and Bridges secretary Man Siddique along with the government’s Road Transport and Bridges minister Obaidul Quader signed the contract with Liu Qitao, chairman of China Communication Construction. The signing took place in Beijing, according to a report in the Bangladesh newspaper The Independent.
  • New bridges for Russia’s Leningrad Region
    April 10, 2020
    Two new bridges are being planned for Russia’s Leningrad Region.
  • RFQ is out for the Gordie Howe Bridge to link US and Canada
    July 22, 2015
    The bidding process has started for the Gordie Howe International Bridge that will link Detroit in the US state of Michigan and Windsor, in the Canadian province of Ontario. The Windsor-Detroit Bridge Authority (WDBA) has sent out a request for qualifications (RFQ) for the bridge that will likely be either cable stayed or suspension to cross the Detroit River. The bridge also likely will come with a hefty price tag – around US$1.62 billion, as World Highways reported in May in a feature on the proposed b
  • Russian bridge building projects
    February 3, 2020
    Three important bridge links are being planned in Russia.