Skip to main content

A new bridge link will improve connectivity in the Ural mountains

By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.
April 16, 2012 Read time: 1 min
By order of Natalya Komarova, the governor of the Khanty-Mansi Autonomous Area (Urals), A feasibility study is underway for the second bridge across the Ob River construction in Russia’s Surgut region. The 1.56km bridge will take 5-6 years to construct and will cost over US$1 billion to build. The first bridge over the Ob River was built in 2000. Average daily traffic already exceeds its planned volume, which is why the second crossing is required.

Related Content

  • Moscow to turn from implementation of Fourth Ring Road project
    January 5, 2016
    The Moscow City Government plans to complete building of the North-East and North-West Chords, two of the biggest road building projects in the city for the last 15 years The links will be completed during the next several months, according to an official spokesman of the Moscow Government. Both roads are considered as a cheaper alternative to the Fourth Ring Road, the construction of which was considered by the Moscow Government several years ago. However due to huge costs, which are estimated at mo
  • New international trade crossing linking Canada and US
    June 9, 2015
    The Detroit River is short, only 45km, and narrow in places, less than 1km. Around a quarter of the annual $658 billion Canada-US trade crosses over the river. That’s $160 billion worth of goods trucked each year between Detroit in the US state of Michigan and the Canadian city of Windsor in the province of Ontario - the Windsor-Detroit Corridor. There are several types of crossings, but the vast majority of commercial traffic must use the 2.3km Ambassador Bridge (see box). A new bridge was initially prop
  • Vancouver eyes bridge, tunnel options
    September 25, 2020
    The Burrard Inlet Rapid Transit Study has listed five potential crossings.
  • Russia’s major new highway project
    July 29, 2021
    The cost of Russia’s major new highway project has been announced