Skip to main content

New bridge link for Tanzania

A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG).
March 21, 2012 Read time: 1 min
A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG). The 36 month project is for a bridge to span Magogoni Creek and the deal was signed between the Chinese firms and Tanzania's 4111 National Social Security Fund (NSSF).

For more information on companies in this article

Related Content

  • Vandals attack road fittings on key Nairobi road link
    April 24, 2013
    A wave of vandalism has hit a new superhighway from Nairobi as Shem Oirere reports. The newly opened 45km superhighway in Kenya’s capital Nairobi is facing a new challenge that threatens to erode its international standards and compromise the benefits it is meant to generate. A wave of vandalism targeting road fittings has hit the US$360 million highway linking Nairobi to Thika Town, posing a new challenge in the maintenance of the new road infrastructure in Kenya. The destruction delayed the completion of
  • Tanzania tolled highway projects being carried out by Chinese firms
    January 10, 2018
    The Tanzania National Road Agency (Tanroads) is managing four major highway projects that have been awarded to four Chinese contractors. In all the routes will stretch for a total of 432km and the work meanwhile will cost a total of around US$313 million. China Geo Engineering Corporation will carry out the work for the Usesula-Komaga route, which will cost $70.21 million. China Wu Yi is building the highway from Komanga to Kasinde, which is costing $62.72 million. China Railway Seventh Group (CRSG) has the
  • New Penang Bridge takes shape
    April 10, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b
  • New Penang Bridge takes shape
    May 9, 2012
    Construction work on the longest bridge in Malaysia and South-East Asia is well underway. Malaysia and South-East Asia is well underway. When completed, the cable-stayed bridge will have a two-lane carriageway and a motorcycle lane in each direction, and will connect Batu Kawan on the mainland to Seberang Perai and Batu Maung on Penang Island. The main span will be 250m long with a length over water of 17km and a 30m height above the water. Costing an estimated US$1.5 billion the 24km long bridge is being b