Skip to main content

New bridge link for Tanzania

A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG).
March 21, 2012 Read time: 1 min
A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG). The 36 month project is for a bridge to span Magogoni Creek and the deal was signed between the Chinese firms and Tanzania's 4111 National Social Security Fund (NSSF).

For more information on companies in this article

Related Content

  • World’s largest bridge deck for KAIA expansion
    December 16, 2013
    A bespoke formwork solution from RMD Kwikform is playing a key role in creating the largest ever airport cast bridge deck as part of the multi-billion dollar expansion of King Abdulaziz International Airport near Jeddah, Saudi Arabia. The firm is also a leading player in the creation of arterial tunnels under the airport’s elevated roads, another key part of the project’s first phase works due for completion in 2014. Guy Woodford reports
  • Uganda road projects funding sought
    February 6, 2017
    The Ugandan Government has unveiled plans to improve its road connections with its northern neighbour South Sudan. To fund the construction project, the Ugandan Government has been seeking a loan worth US$210 million from the Islamic Development Bank (IDB). The terms of the loan arrangements have yet to be revealed however. The aim of the project is to improve the road link running through Rwekunye, Apac, Lira and Acholibur. Better transport links form part of a much wider programme of integration between E
  • RINA Consulting starts to lower Morandi Bridge sections
    February 14, 2019
    Deconstruction of the collapsed Morandi Bridge in Genoa, Italy, has begun, according to RINA Consulting. The first bridge deck section was lowered to the ground from a height of 48m, said Roberto Carpaneto, chief executive of RINA which is responsible for design control and construction management of the project. "We are really satisfied with how this delicate operation is being conducted with the whole construction team working as one to guarantee the best result.” RINA Consulting was chosen by the c
  • Thailand bridge project proposed
    February 20, 2020
    A major bridge project is being proposed for Thailand.