A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG).
      
  
           
                          
                March 21, 2012
              
            
                          
                Read time: 1 min
              
                    
                A new bridge costing over US$136 million will improve transport links in  Tanzania. The 680m cable-stayed bridge will be built by China Major  Bridge Engineering Company (CMBE) and Chinese Railway Construction  Engineering Group (CRCEG). The 36 month project is for a bridge to span  Magogoni Creek and the deal was signed between the Chinese firms and  Tanzania's 4111   National Social Security Fund (NSSF).
      
    
    
        


