Skip to main content

New bridge link for Tanzania

A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG).
March 21, 2012 Read time: 1 min
A new bridge costing over US$136 million will improve transport links in Tanzania. The 680m cable-stayed bridge will be built by China Major Bridge Engineering Company (CMBE) and Chinese Railway Construction Engineering Group (CRCEG). The 36 month project is for a bridge to span Magogoni Creek and the deal was signed between the Chinese firms and Tanzania's 4111 National Social Security Fund (NSSF).

For more information on companies in this article

Related Content

  • Nigeria’s giant city Lagos to benefit from a new cable-stayed bridge
    September 19, 2012
    The first cable-stayed bridge in Nigeria will link two districts of the megacity of Lagos Nigeria’s first cable-stayed bridge, the Lekki Ikoyi Bridge in the megacity of Lagos is scheduled for completion at the end of 2012. Its striking 90m high pylon characterises the appearance of the 1,357m long bridge, which will connect two districts of the West African city, Lekki on the Lekki Peninsula and Ikoyi on Lagos Island.
  • Bangladesh expressway funding secured
    November 11, 2021
    Funding has been secured for a key expressway project in Bangladesh.
  • Kentucky-Indiana bridge project
    April 19, 2023
    Progress is being seen with the Kentucky-Indiana bridge project.
  • XCMG sets out six stage path for future plans
    October 14, 2013
    XCMG has seen strong exports, with one deal in particular providing a major boost to turnover - Mike Woof writes It is rare that a single machine order can provide a substantial portion of a large manufacturer’s annual results. However the firm’s massive contract signed with the Venezuelan Government was a major boost to XCMG; the supply of no less than 6025 machines in a deal worth some US$750 million. This order came at an important time for the company when the world demand for construction equipment sl