Skip to main content

New bridge link for St Petersburg Island

A new bridge is being built to connect Serny Island in St Petersburg. The bridge will feature three lanes of traffic in either direction, as well as pedestrian and cycling facilities. The bridge pylons have been constructed and the cable stays are being installed. The work is costing US$150.4 million.
February 23, 2018 Read time: 1 min
A new bridge is being built to connect Serny Island in St Petersburg. The bridge will feature three lanes of traffic in either direction, as well as pedestrian and cycling facilities. The bridge pylons have been constructed and the cable stays are being installed. The work is costing US$150.4 million.

Related Content

  • A new expressway link for the Philippines
    June 4, 2021
    Work continues on a new expressway link for the Philippines.
  • A new bridge for Vietnam’s Ho Chi Minh City
    September 23, 2019
    A new bridge project is being planned for Vietnam’s Ho Chi Minh City (HCMC). The Thu Thiem 4 Bridge will be 2.2km in length and measure 28m wide and has a projected cost of US$223 million. The bridge will span the Saigon River and connect District 2 with Tan Thuan Dong in District 7, featuring three lanes for vehicle traffic in either direction as well as pedestrian facilities. The construction of the bridge is expected to ease journey times in HCMC, which is notorious for its heavy traffic and chronic cong
  • Russia's road map ahead
    March 5, 2012
    Overall, Russia is to benefit from a major highway investment programme. The Federal Transport Development Programme will feature a budget of $21.5 billion for the 2010-2015 period. Some $15.1 billion is to be allocated for highway construction and repairs. Russian city St Petersburg and the surrounding the Leningrad region will see the start of major investment in infrastructure during 2011. The road sector will benefit strongly, with projects underway including the southern section of the Western High Spe
  • Sunderland’s Northern Spire bridge opens
    August 28, 2018
    Sunderland’s Northern Spire bridge with its 105m-high central A-frame pylon opens to traffic today after a four-month delay because of poor weather. The bridge opened for pedestrians and cyclists yesterday after three Sunderland-built Nissan vehicles first crossed the bridge during a ceremony to mark completion of the project. Work began in May 2015 and the bridge has been built within its allocated €129 million budget. However, poor weather conditions pushed back the opening of the bridge from this past