Skip to main content

New bridge link for Oregon-Washington

The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
April 25, 2012 Read time: 3 mins

The 2364 US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link. The record of decision (ROD) approval is the final step in the project's environmental review and allows Oregon and Washington to begin right-of-way acquisition and construction. “This project is a great example of why we need to strengthen our infrastructure. The old facility is outdated and it no longer meets the needs of the traveling public or commerce in the region.” said Transportation Secretary Ray LaHood. The Columbia River Crossing project will replace the I-5 bridges over the Columbia River that connects Vancouver, Washington, to Portland, Oregon. Costing around $3 billion for bridge, transit and highway improvements, the project is considered a long-term, comprehensive solution to address safety and congestion problems on 8km of I-5 from State Route 500 in Vancouver to Victory Boulevard in Portland and will be funded through a combination of state and federal sources. In addition, numerous improvements to bike/pedestrian facilities will accommodate the bridge’s 1,000 daily pedestrians and 5,000 daily cyclists anticipated by 2030. “This is a vital transportation improvement on one of the busiest interstates in the country,” Federal Highway Administrator Victor Mendez said. “The new bridge will put people to work and help support business and economic growth.” “We are making the long-sought after rail transit link between Portland and Vancouver possible,” Federal Transit Administrator Peter Rogoff said. “This is the type of forward-leaning project that will greatly benefit the entire region well into the future.” Freight congestion is one of the key reasons behind the bridge replacement project. I-5 is the most important freight freeway on the West Coast linking international, national and regional markets in Canada, Mexico and the Pacific Rim with destinations throughout the western United States. Freight volumes moved by truck to and from the area are projected to increase over the years, causing additional delays and cost to shippers. Currently, the bridge serves nearly 130,000 vehicles/day with travel demand expected to grow to 180,000 vehicles/day by 2030. The 5km light rail portion of the project will extend from Portland’s Expo Center MAX station to 5259 Clark College in Vancouver. It is expected that the transit rail project will reduce the duration of daily congestion on I-5 near the Columbia River by 60%. By 2030, the light rail line is expected to carry more than 22,000 passengers/day. The current I-5 crossing of the Columbia River consists of two side-by-side bridges. The bridge carrying northbound traffic was built in 1916, and the bridge carrying southbound traffic was built in 1958. Both bridges are inadequate to carry the current traffic volumes, and the mechanical lift spans that are raised to accommodate river traffic bring interstate traffic to a standstill. The geometry of the bridges makes the existing crossing one of the most unsafe highway locations on the I-5 corridor and its crash rate is double that of similar bridges. In addition, the bridge does not meet the current bridge design standards for earthquakes.

For more information on companies in this article

Related Content

  • New bridge to link New Jersey and Pennsylvania
    March 31, 2016
    A new tolled bridge link is planned to connect the US states of New Jersey and Pennsylvania. The structure will carry traffic on Interstate 95 and span the Delaware River. Construction work for the new bridge is expected to begin next year and take four years to complete, with the new tolled link is expected to open to traffic during 2019. The new crossing will replace the ageing Scudder’s Falls Bridge and this wider and safer structure is expected to cost around US$334 million. The toll charges have yet to
  • Over 1/3rd of US bridges needing repair or replacement
    April 15, 2020
    Over 1/3rd of US bridges are needing repair or replacement according to a new report.
  • $66 billion for Florida transport infrastructure
    March 11, 2025
    $66 billion will be spent on Florida’s transport infrastructure over the next five years.
  • Montreal’s Champlain Bridge superstructure deal signed with Canam-Bridge
    May 22, 2015
    Canada-based Canam-Bridge has been chosen to fabricate the superstructure for the Champlain bridge project in Montreal as well as to supply steel. Marc Dutil, chief executive of Canam, a specialist bridge superstructure fabricator, expects at least 45,000tonnes of steel will be required for the 3.4km bridge that will span the St. Lawrence River which leads to the Great Lakes of North America. The contract is expected to be completed after a formal deal is reached between the SNC-Lavalin consortium con