Skip to main content

New bridge link for Oregon-Washington

The US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link.
April 25, 2012 Read time: 3 mins

The 2364 US Department of Transportation has given the go-ahead for the I-5 Columbia River Crossing project, which will link Washington and Oregon states. The plans involve replacing the existing Interstate 5 Columbia River Crossing Bridges and building a new interstate transit link. The record of decision (ROD) approval is the final step in the project's environmental review and allows Oregon and Washington to begin right-of-way acquisition and construction. “This project is a great example of why we need to strengthen our infrastructure. The old facility is outdated and it no longer meets the needs of the traveling public or commerce in the region.” said Transportation Secretary Ray LaHood. The Columbia River Crossing project will replace the I-5 bridges over the Columbia River that connects Vancouver, Washington, to Portland, Oregon. Costing around $3 billion for bridge, transit and highway improvements, the project is considered a long-term, comprehensive solution to address safety and congestion problems on 8km of I-5 from State Route 500 in Vancouver to Victory Boulevard in Portland and will be funded through a combination of state and federal sources. In addition, numerous improvements to bike/pedestrian facilities will accommodate the bridge’s 1,000 daily pedestrians and 5,000 daily cyclists anticipated by 2030. “This is a vital transportation improvement on one of the busiest interstates in the country,” Federal Highway Administrator Victor Mendez said. “The new bridge will put people to work and help support business and economic growth.” “We are making the long-sought after rail transit link between Portland and Vancouver possible,” Federal Transit Administrator Peter Rogoff said. “This is the type of forward-leaning project that will greatly benefit the entire region well into the future.” Freight congestion is one of the key reasons behind the bridge replacement project. I-5 is the most important freight freeway on the West Coast linking international, national and regional markets in Canada, Mexico and the Pacific Rim with destinations throughout the western United States. Freight volumes moved by truck to and from the area are projected to increase over the years, causing additional delays and cost to shippers. Currently, the bridge serves nearly 130,000 vehicles/day with travel demand expected to grow to 180,000 vehicles/day by 2030. The 5km light rail portion of the project will extend from Portland’s Expo Center MAX station to 5259 Clark College in Vancouver. It is expected that the transit rail project will reduce the duration of daily congestion on I-5 near the Columbia River by 60%. By 2030, the light rail line is expected to carry more than 22,000 passengers/day. The current I-5 crossing of the Columbia River consists of two side-by-side bridges. The bridge carrying northbound traffic was built in 1916, and the bridge carrying southbound traffic was built in 1958. Both bridges are inadequate to carry the current traffic volumes, and the mechanical lift spans that are raised to accommodate river traffic bring interstate traffic to a standstill. The geometry of the bridges makes the existing crossing one of the most unsafe highway locations on the I-5 corridor and its crash rate is double that of similar bridges. In addition, the bridge does not meet the current bridge design standards for earthquakes.

For more information on companies in this article

Related Content

  • UK smart motorway work for M4 link
    September 16, 2019
    Highways England in the UK is carrying out major upgrade work for the busy M4 motorway, running west from capital London. In all 11 bridges are being replaced along a 51km stretch of the M4 between London and Reading. When complete, the current hard shoulder will have been rebuilt and resurfaced to allow traffic to use it as a live lane. The section carrying the heaviest traffic, between the M25 ring road around London and the main exit for Heathrow Airport, will be widened so that it will feature five la
  • Kenya port suspension bridge project makes progress
    January 15, 2019
    A new suspension bridge in Kenya’s key port city, Mombasa, will help unlock potential – Shem Oirere reports Plans for the construction of a US$200 million suspension bridge in Kenya heva moved a notch higher. The country's urban roads agency recently announced the shortlisting of three bidders for the design, finance, construct, operate, maintain and transfer public private partnership (PPP) contract model. Kenya Urban Roads Authority (KURA) is a state agency that manages, develops, rehabilitates and mai
  • Commencing on major new US highway link
    February 23, 2016
    Work is now commencing on the US Route 301 project, which will cost US$635 million and is intended to reduce congestion and benefit commerce in the Northeastern United States. “When completed, the project will link to I-95 and support the economy of not only Delaware but also one of the nation’s largest regions,” said US Transportation Secretary Anthony Foxx. “It will increase access to economic opportunity by making it easier for people to commute to jobs in the fastest growing region of the state.”
  • Successful resurfacing at New York's JFK Airport
    February 8, 2012
    A huge logistics operation has been carried out successfully at New York's JFK Airport. One of the busiest runways at one of the world's busiest airports is now open to air traffic again, following a 120 day closure for resurfacing.