Skip to main content

New bridge link for Nigeria

Construction work on the important Loko-Oweto Bridge project in Nigeria should be complete in May 2019. The project has cost around US$141 million, with contractor Reynolds Construction Company having started work on the 1.8km structure in 2011. Spanning the River Benue, the bridge forms part of the 108km road link connecting Otukpo with Oweto and improves transport connections between Benue State and Nasarawa State. Work on a stretch of the road has been carried CGC Nigeria Limited. Upgrade work is also
February 18, 2019 Read time: 1 min
Construction work on the important Loko-Oweto Bridge project in Nigeria should be complete in May 2019. The project has cost around US$141 million, with contractor Reynolds Construction Company having started work on the 1.8km structure in 2011. Spanning the River Benue, the bridge forms part of the 108km road link connecting Otukpo with Oweto and improves transport connections between Benue State and Nasarawa State. Work on a stretch of the road has been carried CGC Nigeria Limited.


Upgrade work is also planned for the road connecting Aliade to Makurdi. This also is an important link as there is heavy traffic between Onitsha and Enugu to the south and Makurdi, as well as Jos lying further north. Work on the Otukpo-Taraku -Aliade road is being carried out by Rockbridge Construction. Work on the Otukpo-Ninth Mile Road is also being carried out Rockbridge Construction.

Related Content

  • Innovative, flexible bridge formwork systems
    February 14, 2012
    Innovative formwork systems have been used to construct a variety of bridge structures. Patrick Smith reports. As part of the work on Germany's new A4 autobahn near Eisenach, the contracting joint venture awarded the formwork contract for two of the three viaducts to Doka. What makes this assignment so special to the company is that although the two steel composite bridges each have very different cross-sections, the JV is using the same overslung composite forming carriage to pour the carriageway slabs of
  • New airport link road for Lagos
    March 19, 2019
    A rebuilt highway will improve transport from Nigeria’s commercial centre, Lagos, to its main airport. The project is providing a new highway stretch featuring up to five lanes in either direction from Oshodi on the west of the city out to Murtala Muhammed International Airport, which lies to the north. The work commenced in 2017 and is being carried out by the local contractor Hitech Construction Company. The new route will provide an improved connection from the Apapa Oworonshoki Expressway and the proje
  • The Cebu–Cordova Link Expressway
    September 19, 2021
    The 8.5km CCLEx, as it is known, will include the longest and tallest bridge in the Philippines when the structure is finished next year
  • NEW €781 million Danube Bridge for Hungary
    May 7, 2024
    A new €781 million Danube Bridge will be built in Hungary.