Skip to main content

New bridge for Drammen, Norway

A new bridge will be built in Drammen, Norway.
By MJ Woof January 19, 2021 Read time: 2 mins
A new bridge is planned for the Norwegian city of Drammen – image © courtesy of Kvant
A new bridge is to be constructed in the Norwegian city of Drammen. The new bridge will measure 280m in length and will be designed by a team comprising Knight Architects (UK), Saaha (NO), structural engineers Degree of Freedom (NO) and landscape architect Asplan Viak (NO).The new structure will replace an 84-year-old road bridge that spans the River Drammenselva and the local rail station.

The new landmark bridge project forms a key component for the port city’s redevelopment programme. The new City Bridge starts at the station square in Strømsø, the southern part of the city, crossing the newly redeveloped Drammen Rail station, including four platforms and six rail tracks, before stepping over the 150m wide Drammenselva river and tying into the central public square of Bragernes, on the north side of the city. Six stair ramps will provide access to the platforms of the station and to the promenade along the south shore.

The new bridge 19.4m-wide, compared with 15m for the old structure. This will provide additional space for vulnerable road users, while the central carriageway has been designed exclusively for public transport. 

The central element of the bridge, the main river crossing, will be a pair of low lying, shallow steel arches spanning 85m between two narrow piers located close to the river shores.

At both ends of the bridge, significant consideration has been taken to provide a seamless transition between the deck and the local pedestrian and cycle routes. The promenade on the south bank, providing fishing spots and mooring for small boats, will be accessed from the bridge via a bespoke lift.

The development is a joint operation by the City of Drammen (Drammen Kommune) and the Norwegian rail authority Bane NOR which is carried out in two separate lots. Detailed design stage of the bridge will finish in March 2021 and the construction tender will be announced before summer 2021.

Construction works, including the demolition of the existing bridge and the erection of a temporary crossing, will start in 2022. The opening of the new City Bridge is scheduled for 2025.

Related Content

  • Modern formwork systems - fast, flexible, safe
    February 21, 2012
    Speed of erection, safety, cost-efficiency and flexibility are among the attributes of modern formwork systems. Modern formwork and scaffolding systems are attractive in particular for their speed of erection, safety, cost-efficiency and flexibility.
  • Emergent markets key for formwork sector growth
    May 21, 2014
    Central and south-east Europe are hotbeds for new highway infrastructure projects utilising cutting-edge formwork solutions, while a number of leading formwork manufacturers are also looking at emergent markets for growth. Guy Woodford reports Travelling between Hungary’s capital Budapest and Southern Dalmatia now takes less time thanks to the Pan-European Corridor Vc – European route 73. Numerous tunnels and bridges are erected along the 397km stretch of the European route 73 through Bosnia owing to the
  • First deck span completed for Mersey Gateway's north approach viaduct
    April 4, 2016
    The Mersey Gateway Project achieved another milestone as the first deck span for the elevated north approach viaduct was completed. Work started on site in May 2014 to build a six-lane toll bridge over the Mersey River between the towns of Runcorn and Widnes and opening is set for the autumn of 2017. As well as construction of the new bridge, works include the upgrading of 7km of highway to the north and south of the river - the main bridge is 2.2km long – and changing traffic flow so the majority of tra
  • Terex cranes in a tight spot in Michigan
    February 6, 2017
    Terex cranes have been involved in a multiple bridge repair project in the US More than 96,000 vehicles per day travel a stretch of I-96, including its 52-year-old bridges. The Michigan Department of Transportation is in the midst of a two-year US$77 million project to repair bridges and relieve increasing congestion along Interstate 96 at the U.S. Highway 23 interchange in Livingston County. Toebe Construction along with joint venture partner Kamminga & Roodvoets are bringing in a lot of lifting powe