Skip to main content

New bridge for Drammen, Norway

A new bridge will be built in Drammen, Norway.
By MJ Woof January 19, 2021 Read time: 2 mins
A new bridge is planned for the Norwegian city of Drammen – image © courtesy of Kvant
A new bridge is to be constructed in the Norwegian city of Drammen. The new bridge will measure 280m in length and will be designed by a team comprising Knight Architects (UK), Saaha (NO), structural engineers Degree of Freedom (NO) and landscape architect Asplan Viak (NO).The new structure will replace an 84-year-old road bridge that spans the River Drammenselva and the local rail station.

The new landmark bridge project forms a key component for the port city’s redevelopment programme. The new City Bridge starts at the station square in Strømsø, the southern part of the city, crossing the newly redeveloped Drammen Rail station, including four platforms and six rail tracks, before stepping over the 150m wide Drammenselva river and tying into the central public square of Bragernes, on the north side of the city. Six stair ramps will provide access to the platforms of the station and to the promenade along the south shore.

The new bridge 19.4m-wide, compared with 15m for the old structure. This will provide additional space for vulnerable road users, while the central carriageway has been designed exclusively for public transport. 

The central element of the bridge, the main river crossing, will be a pair of low lying, shallow steel arches spanning 85m between two narrow piers located close to the river shores.

At both ends of the bridge, significant consideration has been taken to provide a seamless transition between the deck and the local pedestrian and cycle routes. The promenade on the south bank, providing fishing spots and mooring for small boats, will be accessed from the bridge via a bespoke lift.

The development is a joint operation by the City of Drammen (Drammen Kommune) and the Norwegian rail authority Bane NOR which is carried out in two separate lots. Detailed design stage of the bridge will finish in March 2021 and the construction tender will be announced before summer 2021.

Construction works, including the demolition of the existing bridge and the erection of a temporary crossing, will start in 2022. The opening of the new City Bridge is scheduled for 2025.

Related Content

  • 'Tricky' bridge project
    February 7, 2012
    Contractor Ringway has completed work on a tricky project to replace Stile Farm Bridge, which crosses the Great Stour River near Chilham in County Kent, south-east England. Built in the 1920s, the bridge was in a severe state of disrepair resulting in weight restrictions of just 3tonnes. The new structure has a 16m span and is constructed using pre-cast concrete, with pre-stressed steel-reinforced beams based on cast in-situ abutment, and enables the bridge to carry heavier traffic. As well as helping to ea
  • Norway's bridge meets tough environmental targets
    May 2, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Norway's bridge meets tough environmental targets
    February 27, 2012
    One of the world's longest bridges is being built in Norway – for traffic volumes of just 2,000 cars/day reports Adrian Greeman. The stunning landscape of the long sea fjords in Norway is one of its glories, attracting thousands of tourists every summer. But the high mountains and deep sea inlets are also one of the great obstacles to transport and development.
  • Superlative formwork’s global appeal
    April 25, 2013
    The latest formwork solutions are enabling some tough bridge-building projects to be delivered in South America and Europe, while the world’s largest construction equipment show is seeing the merits of other cutting-edge formwork. Guy Woodford reports. Taking a road and rail link across one of South America’s largest rivers, together with its swamps and floodplain, calls for a new crossing of superlative dimensions. Two 135.5m pylons for the third bridge across the Orinoco River in Venezuela are taking shap