Skip to main content

New bridge connection planned for Taiwan

Work looks set to start during 2018 on Taiwan’s new Tamkang Bridge project. The construction is expected to cost in the order of US$429 million, with the work being carried out by the contractor, Kung Sing Engineering, with completion expected in 2020. The project has been split into three phases, constructing a road from the Port of Taipei, building the 920m-long bridge itself and a new road from the bridge to Bali. This last section of the project has already been completed however. Once the entire
March 26, 2018 Read time: 1 min

Work looks set to start during 2018 on Taiwan’s new Tamkang Bridge project. The construction is expected to cost in the order of US$429 million, with the work being carried out by the contractor, Kung Sing Engineering, with completion expected in 2020. The project has been split into three phases, constructing a road from the Port of Taipei, building the 920m-long bridge itself and a new road from the bridge to Bali. This last section of the project has already been completed however. Once the entire project has been finished, the new link will help reduce peak time traffic congestion and cut journey times for drivers.

Related Content

  • A new Indian cable-stayed bridge will improve transport connections
    March 2, 2015
    A major new cable-stayed bridge is being constructed in India - Partha Bratim Basistha reports. In India the construction of a major cable-stayed bridge is underway that will boost connections from capital Delhi to its surrounding areas. The bridge is being built in a bid to ease growing interstate traffic movement between Delhi and the surrounding North Indian states of Punjab, Uttar Pradesh, Haryana and Himachal Pradesh. Named Signature Bridge, this is a landmark structure due to its design aesthetics and
  • Israel link upgrade
    March 19, 2012
    Israel’s National Infrastructure Committee (INRC) has now issued its final approval for upgrades to Road No 1.
  • Mini-bridge aids Forth repairs
    July 17, 2012
    An engineering "first" means that rehabilitation work on a vital Scottish bridge built over 40 years ago can be carried out smoothly A new report to the Forth Estuary Transport Authority (FETA) in Scotland recommends appointing Balfour Beatty Civil Engineering of Edinburgh as 'preferred bidder' to carry out the scheduled replacement of the bridge's main expansion joints in 2009. However, the report to the bridge authority says the tender price of £13.7 million (US$21.3 million) is some £5 million ($7.8 mill
  • Southern Africa bridge connection for Zambia and Botswana
    April 6, 2018
    Work is close to completion for the Kazungula Bridge, which will span the Zambezi River and connect Zambia and Botswana.