Skip to main content

New bridge connection from Nigeria to Cameroon

A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries.
August 18, 2015 Read time: 2 mins

A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries. Work on the new dual carriageway bridge has been delayed but the link should be complete and ready for traffic by the end of 2015.

The 276m bridge is being built by a Chinese contractor, China Civil Engineering Construction Company, with work having commenced two years ago following the tender process in 2011. Funding is being provided by the African Development Bank (AfDB). The new structure will take the place of the single lane suspension bridge currently connecting Nigeria with Cameroon but which has insufficient capacity for the traffic needs.

The new Cross River Bridge forms part of a wider project to connect the Nigerian city of Enugu with Bamenda in Cameroon, a distance of 443km. Some 240km of the highway route runs through Nigeria, from Enugu, though Abakaliki and to the border at Ekok. The remaining 203km is in Cameroon and runs through Mfum to Mamfé and Bamenda. As well as connecting Enugu and Bamenda, this new road link will also provide better transport connections to and from the Nigerian port of Calabar into neighbouring Cameroon.

Completion of the new route will improve trade and transport between the neighbouring nations, which has been hampered by inadequate links in the past. In addition to the new cross border bridge, there is another 100m long bridge on the route that spans the Munaya River, a tributary of the Cross River, in Cameroon.

Related Content

  • $6.2 billion New Jersey Turnpike project
    May 16, 2025
    Approval is given for the $6.2 billion New Jersey Turnpike project.
  • PERI’s balancing act at the Harpe Bru Bridge in Norway
    May 24, 2016
    Plans for the European Route E6 expansion in Norway include the 320m-long Harpe Bru Bridge over the Gudbrandsdalen Lågen River, at Sør-Fron in Oppland province. For the superstructure, PERI civil engineering technology experts developed a balanced cantilevered solution based on the VARIOKIT Engineering Construction Kit. Statens vegvesen, Norway’s agency for public road building, selected an extradosed cable-stayed bridge design – the first such bridge in Norway. It combines the load-bearing behaviour
  • Diamond in the Pearl: China’s Hong Kong-Zhuhai-Macao Bridge complex
    March 8, 2018
    People in the Pearl River Delta are celebrating the Chinese New Year with the imminent opening of the Hong Kong-Zhuhai-Macao Bridge. David Arminas reviews progress. China’s Spring Festival, or Lunar New Year, is celebrated with the usual enthusiasm and spectacular fireworks. But celebrations will be particularly joyous for many people in the southern Pearl River Delta. The soon-to-be-open Hong Kong-Zhuhai-Macao Bridge (HZMB) will slash travel time between the Hong Kong Special Administrative Region, Zhuh
  • Florida highway rebuild project
    May 2, 2018
    Rebuilding a congested stretch of highway in Florida will cut congestion and boost safety for commuters - Mike Woof writes. Florida’s 214km-long I-4 highway provides a key transport route between Tampa and Daytona Beach, but has an unenviable reputation for both congestion and safety, with frequent delays due to heavy traffic as well as crashes. The stretch running through the city of Orlando is particularly prone to jams at peak periods, with huge traffic volumes resulting in vehicles having to slow to a c