Skip to main content

New bridge connection from Nigeria to Cameroon

A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries.
August 18, 2015 Read time: 2 mins

A new bridge is being built linking Cameroon and Nigeria and spanning the Cross River where it forms the border between the two countries. Work on the new dual carriageway bridge has been delayed but the link should be complete and ready for traffic by the end of 2015.

The 276m bridge is being built by a Chinese contractor, China Civil Engineering Construction Company, with work having commenced two years ago following the tender process in 2011. Funding is being provided by the African Development Bank (AfDB). The new structure will take the place of the single lane suspension bridge currently connecting Nigeria with Cameroon but which has insufficient capacity for the traffic needs.

The new Cross River Bridge forms part of a wider project to connect the Nigerian city of Enugu with Bamenda in Cameroon, a distance of 443km. Some 240km of the highway route runs through Nigeria, from Enugu, though Abakaliki and to the border at Ekok. The remaining 203km is in Cameroon and runs through Mfum to Mamfé and Bamenda. As well as connecting Enugu and Bamenda, this new road link will also provide better transport connections to and from the Nigerian port of Calabar into neighbouring Cameroon.

Completion of the new route will improve trade and transport between the neighbouring nations, which has been hampered by inadequate links in the past. In addition to the new cross border bridge, there is another 100m long bridge on the route that spans the Munaya River, a tributary of the Cross River, in Cameroon.

Related Content

  • Bridge drainage solution prevents water damage
    February 10, 2012
    Pipeline & Drainage Systems (PDS), is pointing to its EnviroDeck drainage product saying that unless properly drained, water can cause severe damage to bridges, particularly on deck surfaces where it may become trapped.
  • Towers of power: California’s Gerald Desmond Bridge Replacement
    May 8, 2019
    Challenging ground conditions meant a design rethink - and some engineering firsts - for California’s Gerald Desmond Bridge Replacement Project* The Port of Long Beach on Terminal Island south of Los Angeles is the second-busiest container port in the US. It handles around 15% of all imported goods, much of it with Asia. As the Port of Long Beach was growing in importance over the past half century, the 51-year-old Gerald Desmond Bridge has faithfully been delivering thousands of daily commuters to wo
  • Bulgaria: back on track?
    July 23, 2012
    Several important Bulgarian road projects are expected to gain momentum over the coming weeks, a welcome boost for a sector that has been beset by delays in the past. In mid-September, the National Road Infrastructure Agency (NRIA) announced that it would soon be declaring new tenders for the construction of two key road projects worth a total of US$94 million (approximately €68.8 million). One section will link the south-eastern city of Kardzhali to Podkova, near the Greek border: the second will connect t
  • VIDEO: M6 motorway link taking shape between Knutsford and Bowdon
    August 23, 2016
    In the UK, work to connect sections of the new €223 million A556 Knutsford to Bowdon dual carriageway, between the M6 and M56 in Cheshire, will get underway in earnest at the weekend with the opening of its first bridge.

    The route of the road, forming a link between junction 19 of the M6 motorway at Knutsford and junction 7 of the M56 motorway at Bowdon, has been taking shape for some time.